X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424262406000

Well Details

Well ID: 0424262406000
Loading map...
Location: 00/06-24-042-26W4/0
Location Alias: 00/06-24-42-26 W4M
Location Alias 2: 00/06-24-042-26 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 26
Section: 24
County/Municipality: Ponoka County
Well Name: OEI CHIGWELL 6-24-42-26
Operator Name: AlphaBow Energy Ltd.
License Number: 0107362
License Date: 1984-05-30
License Status: Issued
Spud Date: 1984-06-02
Final Drill Date: 1984-06-08
Well Total Depth: 1428.00 m
Surface Hole Latitude: 52.629304
Surface Hole Longitude: -113.618352

For data sources see[1][2]

Well History

Date Event
1984-05-30 Obtained License
1984-06-03 Surface Casing Operation Performed
1984-06-08 Finished Drilling
1984-06-08 Well Log Performed
1984-06-08 Well Mode changed to Drilled and Cased
1984-06-09 Drill Stem Test Performed
1984-06-10 Production Casing Operation Performed
1984-06-10 Rig Released
1984-06-21 Well Log Performed
1984-06-22 Well Log Performed
1984-06-23 Perforation Treatment Performed - Jet Perforation
1984-07-08 Well Began Production
1984-07-08 Well Fluid changed to Crude Oil
1984-07-08 Well Mode changed to Pumping
1989-08-17 Well Log Performed
1989-08-18 Perforation Treatment Performed - Jet Perforation
1989-08-19 Perforation Treatment Performed - Fractured
2000-06-16 Perforation Treatment Performed - Jet Perforation
2000-06-23 Perforation Treatment Performed - Jet Perforation
2000-09-28 Perforation Treatment Performed - Cement Squeeze
2000-09-28 Plug Back Performed
2013-03-12 Well Fluid changed to Crude Oil
2013-03-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-06-23 Perforation 1378.00 1382.00 7
1989-08-18 Perforation 1378.00 1382.00 13
1989-08-19 Fracture 1378.00 1382.00 0
2000-06-16 Perforation 721.50 723.00 17
2000-06-16 Perforation 717.50 719.00 17
2000-06-23 Perforation 797.00 799.00 17
2000-06-23 Perforation 793.00 795.00 17
2000-09-28 Cement Squeeze 793.00 799.00 0
2000-09-28 Cement Squeeze 717.50 723.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3541 0.0 0.0 0.0
1985 7247 0.0 0.0 0.0
1986 6627 0.0 0.0 0.0
1987 8472 0.0 0.0 0.0
1988 8112 0.0 0.0 0.0
1989 5951 0.0 0.0 0.0
1990 5790 0.0 0.0 0.0
1991 5397 0.0 0.0 0.0
1992 7470 0.0 0.0 0.0
1993 8224 0.0 0.0 0.0
1994 7685 0.0 0.0 0.0
1995 6083 0.0 0.0 0.0
1996 7258 0.0 0.0 0.0
1997 7077 0.0 0.0 0.0
1998 8515 0.0 0.0 0.0
1999 8403 0.0 0.0 0.0
2000 5783 0.0 0.0 0.0
2001 8558 0.0 0.0 0.0
2002 8723 0.0 0.0 0.0
2003 8728 0.0 0.0 0.0
2004 8636 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 7866 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 7751 0.0 0.0 0.0
2009 168 0.0 0.0 0.0
2010 2394 0.0 0.0 0.0
2011 7595 0.0 0.0 0.0
2012 8145 0.0 0.0 0.0
2013 8085 0.0 0.0 0.0
2014 8276 0.0 0.0 0.0
2015 8618 0.0 0.0 0.0
2016 8494 0.0 0.0 0.0
2017 6973 0.0 0.0 0.0
2018 5360 0.0 0.0 0.0
2019 7218 0.0 0.0 0.0
2020 1115 0.0 0.0 0.0

For data sources see[5]

References