X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424262712022

Well Details

Well ID: 0424262712022
Loading map...
Location: 02/12-27-042-26W4/2
Location Alias: 02/12-27-42-26 W4M
Location Alias 2: 02/12-27-042-26 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 26
Section: 27
County/Municipality: Ponoka County
Well Name: EXORO ENERGY CHIGWELL 12-27-42-26
Operator Name: Gear Energy Ltd.
License Number: 0449135
License Date: 2012-10-12
License Status: Issued
Spud Date: 2012-10-18
Final Drill Date: 2012-10-21
Well Total Depth: 913.50 m
Surface Hole Latitude: 52.646234
Surface Hole Longitude: -113.668183

For data sources see[1][2]

Well History

Date Event
2012-10-12 Obtained License
2012-10-19 Surface Casing Operation Performed
2012-10-20 Direction Drilling Operation Performed - Deviate
2012-10-21 Finished Drilling
2012-10-21 Well Mode changed to Drilled and Cased
2012-10-22 Production Casing Operation Performed
2012-10-22 Rig Released
2012-10-22 Well Log Performed
2012-10-25 Perforation Treatment Performed - Jet Perforation
2012-10-25 Well Log Performed
2012-12-15 Perforation Treatment Performed - Jet Perforation
2012-12-15 Well Log Performed
2012-12-18 Perforation Treatment Performed - Cement Squeeze
2012-12-19 Perforation Treatment Performed - Jet Perforation
2012-12-19 Well Log Performed
2018-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-13 Perforation Treatment Performed - Jet Perforation
2018-03-13 Plug Back Performed
2018-03-13 Well Log Performed
2018-03-18 Perforation Treatment Performed - Fractured
2018-06-01 Well Began Production
2018-06-01 Well Fluid changed to Water
2018-06-01 Well Type changed to Source

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-10-20 181.40 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-25 Perforation 845.00 846.60 20
2018-03-13 Perforation 637.00 641.00 20
2018-03-18 Fracture 637.00 743.00 0
2012-12-15 Perforation 844.00 845.00 20
2012-12-18 Cement Squeeze 844.00 846.60 0
2012-12-19 Perforation 845.50 847.00 17
2018-03-13 Packing Device Capped w/Cement 826.00 834.00 0
2018-03-13 Perforation 739.00 743.00 20
2018-03-13 Perforation 723.00 725.00 20
2018-03-13 Perforation 694.00 698.00 20
2018-03-13 Perforation 677.00 680.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4968 0.0 0.0 0.0
2019 8183 0.0 0.0 0.0
2020 1583 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-22 No Incident Encountered 0.00 0.00
2012-10-24 No Incident Encountered 0.00 0.00
2012-12-15 No Incident Encountered 0.00 0.00
2018-03-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References