X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424283510000

Well Details

Well ID: 0424283510000
Loading map...
Location: 00/10-35-042-28W4/0
Location Alias: 00/10-35-42-28 W4M
Location Alias 2: 00/10-35-042-28 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 28
Section: 35
County/Municipality: Ponoka County
Well Name: BONAVISTA FBANK 10-35-42-28
Operator Name: Bonavista Energy Corporation
License Number: 0138233
License Date: 1989-01-13
License Status: RecCertified
Spud Date: 1989-02-04
Final Drill Date: 1989-02-08
Well Total Depth: 1000.00 m
Surface Hole Latitude: 52.663072
Surface Hole Longitude: -113.925985

For data sources see[1][2]

Well History

Date Event
1989-01-13 Obtained License
1989-02-05 Surface Casing Operation Performed
1989-02-08 Finished Drilling
1989-02-08 Well Log Performed
1989-02-08 Well Mode changed to Drilled and Cased
1989-02-09 Production Casing Operation Performed
1989-02-09 Rig Released
1989-07-18 Well Log Performed
1989-07-19 Perforation Treatment Performed - Jet Perforation
1989-07-20 Perforation Treatment Performed - Fractured
1989-07-23 Well Log Performed
1989-08-22 Well Began Production
1989-08-22 Well Fluid changed to Crude Oil
1989-08-22 Well Mode changed to Pumping
1991-09-18 Well Log Performed
1991-09-19 Well Began Injection
1991-09-19 Well Fluid changed to Water
1991-09-19 Well Type changed to Injection
1991-11-01 Well Fluid changed to Water
1991-11-01 Well Type changed to Injection
1999-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-20 Plug Back Performed
1999-07-20 Well Fluid changed to Water
1999-07-20 Well Mode changed to Abandoned Zone
1999-07-20 Well Type changed to Injection
1999-07-21 Well Log Performed
1999-07-26 Perforation Treatment Performed - Jet Perforation
1999-07-27 Well Log Performed
1999-08-10 Perforation Treatment Performed - Jet Perforation
1999-08-11 Well Log Performed
1999-08-14 Perforation Treatment Performed - Jet Perforation
1999-08-25 Perforation Treatment Performed - Jet Perforation
1999-08-26 Well Log Performed
2000-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-29 Plug Back Performed
2000-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-30 Plug Back Performed
2000-10-01 Well Log Performed
2000-10-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-07-19 Perforation 953.50 958.00 13
2000-09-29 Packing Device Capped w/Cement 855.00 863.00 0
2000-09-30 Packing Device Capped w/Cement 753.00 760.00 0
2000-09-30 Packing Device Capped w/Cement 717.00 725.00 0
2000-09-30 Packing Device Capped w/Cement 672.00 680.00 0
1989-07-20 Fracture 953.50 958.00 0
1999-07-20 Packing Device Capped w/Cement 937.00 945.00 0
1999-07-26 Perforation 882.00 887.00 17
1999-07-26 Perforation 867.00 870.00 17
1999-08-10 Perforation 774.00 777.00 17
1999-08-10 Perforation 768.00 773.00 17
1999-08-14 Perforation 731.00 734.00 17
1999-08-25 Perforation 685.00 688.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2628 0.0 0.0 0.0
1990 4680 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References