X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425010912002

Well Details

Well ID: 0425010912002
Loading map...
Location: 00/12-09-042-01W5/2
Location Alias: 00/12-09-42-01 W5M
Location Alias 2: 00/12-09-042-01 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 01
Section: 09
County/Municipality: Ponoka County
Well Name: BEC HOMRIM 12-9-42-1
Operator Name: Bonavista Energy Corporation
License Number: 0396417
License Date: 2008-05-07
License Status: Amended
Spud Date: 2008-06-17
Final Drill Date: 2008-06-23
Well Total Depth: 1923.00 m
Surface Hole Latitude: 52.606675
Surface Hole Longitude: -114.092116

For data sources see[1][2]

Well History

Date Event
2008-05-07 Obtained License
2008-06-19 Surface Casing Operation Performed
2008-06-23 Finished Drilling
2008-06-23 Well Mode changed to Drilled and Cased
2008-06-24 Well Log Performed
2008-06-25 Production Casing Operation Performed
2008-06-26 Rig Released
2008-06-28 Well Log Performed
2008-07-04 Well Log Performed
2008-07-05 Perforation Treatment Performed - Jet Perforation
2008-07-06 Perforation Treatment Performed - Fractured
2008-07-13 Well Log Performed
2008-07-16 Perforation Treatment Performed - Jet Perforation
2008-07-18 Perforation Treatment Performed - Fractured
2008-07-24 Well Log Performed
2008-07-25 Well Log Performed
2008-07-26 Perforation Treatment Performed - Jet Perforation
2008-07-26 Perforation Treatment Performed - Remedial Casing
2008-07-30 Perforation Treatment Performed - Jet Perforation
2008-08-06 Well Log Performed
2008-08-07 Perforation Treatment Performed - Cement Squeeze
2008-11-22 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-07-05 Perforation 1897.50 1898.50 17
2008-08-07 Cement Squeeze 398.00 399.00 0
2008-07-05 Perforation 1901.00 1902.00 17
2008-07-06 Fracture 1897.50 1902.00 0
2008-07-16 Perforation 1862.00 1863.00 17
2008-07-16 Perforation 1866.80 1867.80 17
2008-07-18 Fracture 1862.00 1867.80 0
2008-07-26 Perforation 450.00 451.00 7
2008-07-26 Remedial Casing Cementing 450.00 451.00 0
2008-07-30 Perforation 398.00 399.00 7

For data sources see[4]



References