X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425020908000

Well Details

Well ID: 0425020908000
Loading map...
Location: 00/08-09-042-02W5/0
Location Alias: 00/08-09-42-02 W5M
Location Alias 2: 00/08-09-042-02 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 02
Section: 09
County/Municipality: Ponoka County
Well Name: JOURNEY HOMRIM 8-9-42-2
Operator Name: Journey Energy Inc.
License Number: 0114853
License Date: 1985-05-23
License Status: Issued
Spud Date: 1985-06-17
Final Drill Date: 1985-07-12
Well Total Depth: 2405.00 m
Surface Hole Latitude: 52.600174
Surface Hole Longitude: -114.222903

For data sources see[1][2]

Well History

Date Event
1985-05-23 Obtained License
1985-06-18 Kick Occurred
1985-06-18 Lost Circulation Occurred
1985-06-19 Surface Casing Operation Performed
1985-06-20 Well Log Performed
1985-06-27 Well Log Performed
1985-06-28 Intermediate Casing Operation Performed
1985-07-06 Direction Drilling Operation Performed - Deviate
1985-07-12 Finished Drilling
1985-07-12 Well Mode changed to Drilled and Cased
1985-07-13 Well Log Performed
1985-07-14 Drill Stem Test Performed
1985-07-16 Well Log Performed
1985-07-17 Liner Casing Operation Performed
1985-07-18 Rig Released
1985-09-23 Well Log Performed
1985-09-24 Well Log Performed
1985-09-25 Perforation Treatment Performed - Jet Perforation
1985-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-03 Well Began Production
1985-11-03 Well Fluid changed to Crude Oil
1985-11-03 Well Mode changed to Pumping
1986-01-09 Perforation Treatment Performed - Jet Perforation
1986-01-09 Well Log Performed
1986-01-10 Well Log Performed
1986-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-10 Well Log Performed
1995-07-16 Perforation Treatment Performed - Jet Perforation
1995-07-16 Well Fluid changed to Crude Oil
1995-07-16 Well Mode changed to Suspended
1995-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-05 Well Fluid changed to Crude Oil
1996-07-05 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-07-06 2100.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-25 Perforation 1891.30 1893.50 13
1985-09-27 Acid Treatment 1891.30 1893.50 0
1986-01-09 Perforation 1879.50 1881.00 14
1986-01-09 Perforation 1887.00 1888.50 14
1986-02-10 Acid Treatment 1879.50 1893.50 0
1995-07-16 Perforation 1869.50 1873.50 17
1995-07-17 Acid Treatment 1869.50 1881.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1401 0.0 0.0 0.0
1986 7990 0.0 0.0 0.0
1987 8719 0.0 0.0 0.0
1988 8554 0.0 0.0 0.0
1989 8438 0.0 0.0 0.0
1990 8370 0.0 0.0 0.0
1991 8627 0.0 0.0 0.0
1992 7089 0.0 0.0 0.0
1993 8095 0.0 0.0 0.0
1994 7249 0.0 0.0 0.0
1995 4127 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-18 Lost Circulation 120.00 171.00
1985-06-18 Kick 266.00 266.00

For data sources see[7]

References