If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425023316020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.665797,"lon":-114.222614,"icon":""}]} |
Location: 02/16-33-042-02W5/0 | |
Location Alias: 02/16-33-42-02 W5M | |
Location Alias 2: 02/16-33-042-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Ponoka County | |
Well Name: NORTHROCK ET AL 02 HOMRIM 16-33-42-2 | |
Operator Name: TAQA North Ltd. | |
License Number: 0228882 | |
License Date: 1999-11-18 | |
License Status: Issued | |
Spud Date: 1999-11-30 | |
Final Drill Date: 1999-12-05 | |
Well Total Depth: 1154.00 m | |
Surface Hole Latitude: 52.665797 | |
Surface Hole Longitude: -114.222614 |
Date | Event |
---|---|
1999-11-18 | Obtained License |
1999-12-01 | Surface Casing Operation Performed |
1999-12-04 | Well Log Performed |
1999-12-05 | Finished Drilling |
1999-12-06 | Well Log Performed |
1999-12-07 | Production Casing Operation Performed |
1999-12-07 | Rig Released |
1999-12-07 | Well Mode changed to Drilled and Cased |
1999-12-12 | Well Log Performed |
1999-12-13 | Perforation Treatment Performed - Jet Perforation |
1999-12-13 | Well Log Performed |
1999-12-16 | Perforation Treatment Performed - Fractured |
1999-12-24 | Well Began Production |
1999-12-24 | Well Fluid changed to Gas |
1999-12-24 | Well Mode changed to Flowing |
2019-09-01 | Well Fluid changed to Gas |
2019-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-12-13 | Perforation | 1085.00 | 1089.00 | 17 |
1999-12-13 | Perforation | 1093.00 | 1097.00 | 17 |
1999-12-16 | Fracture | 1085.00 | 1089.00 | 0 |
1999-12-16 | Fracture | 1093.00 | 1097.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 186 | 0.0 | 0.0 | 0.0 |
2000 | 8344 | 0.0 | 0.0 | 0.0 |
2001 | 7134 | 0.0 | 0.0 | 0.0 |
2002 | 6557 | 0.0 | 0.0 | 0.0 |
2003 | 8192 | 0.0 | 0.0 | 0.0 |
2004 | 8640 | 0.0 | 0.0 | 0.0 |
2005 | 8543 | 0.0 | 0.0 | 0.0 |
2006 | 8711 | 0.0 | 0.0 | 0.0 |
2007 | 8303 | 0.0 | 0.0 | 0.0 |
2008 | 8213 | 0.0 | 0.0 | 0.0 |
2009 | 8712 | 0.0 | 0.0 | 0.0 |
2010 | 6057 | 0.0 | 0.0 | 0.0 |
2011 | 2963 | 0.0 | 0.0 | 0.0 |
2012 | 8591 | 0.0 | 0.0 | 0.0 |
2013 | 8665 | 0.0 | 0.0 | 0.0 |
2014 | 8495 | 0.0 | 0.0 | 0.0 |
2015 | 8207 | 0.0 | 0.0 | 0.0 |
2016 | 7832 | 0.0 | 0.0 | 0.0 |
2017 | 8678 | 0.0 | 0.0 | 0.0 |
2018 | 2903 | 0.0 | 0.0 | 0.0 |
For data sources see[5]