X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425031914002

Well Details

Well ID: 0425031914002
Loading map...
Location: 00/14-19-042-03W5/2
Location Alias: 00/14-19-42-03 W5M
Location Alias 2: 00/14-19-042-03 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 03
Section: 19
County/Municipality: Ponoka County
Well Name: JOURNEY PEMBINA 14-19-42-3
Operator Name: Journey Energy Inc.
License Number: 0201753
License Date: 1997-05-27
License Status: Issued
Spud Date: 1997-06-18
Final Drill Date: 1997-06-27
Well Total Depth: 2367.00 m
Surface Hole Latitude: 52.637981
Surface Hole Longitude: -114.423725

For data sources see[1][2]

Well History

Date Event
1997-05-27 Obtained License
1997-06-19 Surface Casing Operation Performed
1997-06-27 Finished Drilling
1997-06-27 Well Log Performed
1997-06-28 Drill Stem Test Performed
1997-06-30 Production Casing Operation Performed
1997-06-30 Rig Released
1997-07-15 Well Log Performed
1997-07-16 Perforation Treatment Performed - Jet Perforation
1997-07-16 Well Log Performed
1997-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-22 Well Log Performed
1997-07-23 Well Log Performed
1997-07-24 Perforation Treatment Performed - Jet Perforation
1997-07-27 Perforation Treatment Performed - Fractured
1997-08-11 Well Log Performed
1997-08-12 Perforation Treatment Performed - Jet Perforation
1997-12-01 Well Mode changed to Drilled and Cased
2003-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-01 Perforation Treatment Performed - Cement Squeeze
2003-08-01 Plug Back Performed
2003-08-01 Well Mode changed to Abandoned Zone
2003-08-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-16 Perforation 2330.00 2332.00 17
1997-08-12 Perforation 1636.00 1639.00 18
2003-08-01 Acid Treatment 1636.00 1639.00 0
2003-08-01 Cement Squeeze 1636.00 1639.00 0
2003-08-09 Fracture 2138.00 2153.00 0
1997-07-16 Perforation 2333.00 2335.50 17
1997-07-16 Perforation 2339.00 2345.00 17
1997-07-19 Acid Treatment 2330.00 2345.00 0
1997-07-22 Packing Device Capped w/Cement 2320.00 2328.00 0
1997-07-24 Perforation 2138.00 2153.00 18
1997-07-24 Perforation 2161.00 2163.00 18
1997-07-24 Perforation 2167.00 2168.00 18
1997-07-27 Fracture 2138.00 2168.00 0

For data sources see[4]



References