X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425040504020

Well Details

Well ID: 0425040504020
Loading map...
Location: 02/04-05-042-04W5/0
Location Alias: 02/04-05-42-04 W5M
Location Alias 2: 02/04-05-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 05
County/Municipality: Ponoka County
Well Name: BEC HZ GILBY 4-5-42-4
Operator Name: Bonavista Energy Corporation
License Number: 0433396
License Date: 2011-05-10
License Status: Issued
Spud Date: 2011-12-08
Final Drill Date: 2011-12-21
Well Total Depth: 3590.00 m
Surface Hole Latitude: 52.597105
Surface Hole Longitude: -114.552381

For data sources see[1][2]

Well History

Date Event
2011-05-10 Obtained License
2011-12-09 Surface Casing Operation Performed
2011-12-13 Direction Drilling Operation Performed - Horizontal
2011-12-14 Well Log Performed
2011-12-15 Intermediate Casing Operation Performed
2011-12-21 Finished Drilling
2011-12-21 Well Log Performed
2011-12-21 Well Mode changed to Drilled and Cased
2011-12-22 Liner Casing Operation Performed
2011-12-23 Perforation Treatment Performed - Open-Hole Completion
2011-12-23 Rig Released
2012-01-03 Well Log Performed
2012-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-06 Well Began Production
2012-01-06 Well Fluid changed to Gas
2012-01-06 Well Mode changed to Flowing
2019-01-01 Well Fluid changed to Gas
2019-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-13 1835.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-23 Open Hole/Barefoot Completion 2291.00 3590.00 0
2012-01-04 Multi-Stage Fracture 3289.10 3415.00 0
2012-01-04 Multi-Stage Fracture 3415.00 3527.50 0
2012-01-04 Multi-Stage Fracture 3527.50 3587.00 0
2012-01-04 Multi-Stage Fracture 2308.90 2434.80 0
2012-01-04 Multi-Stage Fracture 2434.80 2547.20 0
2012-01-04 Multi-Stage Fracture 2547.20 2673.10 0
2012-01-04 Multi-Stage Fracture 2673.10 2799.10 0
2012-01-04 Multi-Stage Fracture 2799.10 2925.00 0
2012-01-04 Multi-Stage Fracture 2925.00 3037.50 0
2012-01-04 Multi-Stage Fracture 3037.50 3163.40 0
2012-01-04 Multi-Stage Fracture 3163.40 3289.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8325 0.0 0.0 0.0
2013 8758 0.0 0.0 0.0
2014 8503 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 8618 0.0 0.0 0.0
2017 8587 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References