X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425041211004

Well Details

Well ID: 0425041211004
Loading map...
Location: 00/11-12-042-04W5/4
Location Alias: 00/11-12-42-04 W5M
Location Alias 2: 00/11-12-042-04 W5/04
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 12
County/Municipality: Ponoka County
Well Name: JOURNEY PEMBINA 11-12-42-4
Operator Name: Journey Energy Inc.
License Number: 0080236
License Date: 1980-01-04
License Status: Issued
Spud Date: 1980-01-21
Final Drill Date: 1980-02-01
Well Total Depth: 2147.30 m
Surface Hole Latitude: 52.605926
Surface Hole Longitude: -114.450109

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-04 Obtained License
1980-01-22 Perforation Treatment Performed - Jet Perforation
1980-01-27 Perforation Treatment Performed - Cement Squeeze
1980-01-28 Perforation Treatment Performed - Cement Squeeze
1980-01-30 Perforation Treatment Performed - Cement Squeeze
1980-02-01 Finished Drilling
1980-02-01 Perforation Treatment Performed - Jet Perforation
1980-02-01 Well Mode changed to Drilled and Cased
1980-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-09 Perforation Treatment Performed - Jet Perforation
1980-02-10 Perforation Treatment Performed - Fractured
1991-06-13 Well Log Performed
1991-06-14 Perforation Treatment Performed - Jet Perforation
1991-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-01 Well Began Production
1991-08-01 Well Fluid changed to Crude Oil
1991-08-01 Well Mode changed to Pumping
1991-10-01 Well Fluid changed to Crude Oil
1991-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-22 Perforation 1757.20 1760.80 3
1980-02-10 Fracture 2050.10 2058.30 0
1991-06-14 Perforation 1757.20 1760.80 13
1991-06-15 Acid Treatment 1757.20 1760.80 0
1980-01-27 Cement Squeeze 1757.20 1760.80 0
1980-01-28 Cement Squeeze 1757.20 1760.80 0
1980-01-30 Cement Squeeze 1757.20 1760.80 0
1980-02-01 Perforation 2119.30 2120.80 7
1980-02-01 Perforation 2125.10 2133.00 7
1980-02-06 Acid Treatment 2119.30 2133.00 0
1980-02-09 Perforation 2050.10 2053.70 10
1980-02-09 Perforation 2055.60 2058.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 600 0.0 0.0 0.0

For data sources see[5]

References