X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425041402000

Well Details

Well ID: 0425041402000
Loading map...
Location: 00/02-14-042-04W5/0
Location Alias: 00/02-14-42-04 W5M
Location Alias 2: 00/02-14-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 14
County/Municipality: Ponoka County
Well Name: TQN ET AL HZ WILSONCK 2-14-42-4
Operator Name: TAQA North Ltd.
License Number: 0444786
License Date: 2012-03-08
License Status: Issued
Spud Date: 2012-08-11
Final Drill Date: 2012-08-23
Well Total Depth: 3750.80 m
Surface Hole Latitude: 52.627122
Surface Hole Longitude: -114.473146

For data sources see[1][2]

Well History

Date Event
2012-03-08 Obtained License
2012-08-12 Surface Casing Operation Performed
2012-08-15 Direction Drilling Operation Performed - Deviate
2012-08-16 Direction Drilling Operation Performed - Horizontal
2012-08-23 Finished Drilling
2012-08-23 Perforation Treatment Performed - Open-Hole Completion
2012-08-23 Well Mode changed to Drilled and Cased
2012-08-24 Perforation Treatment Performed - Jet Perforation
2012-08-24 Production Casing Operation Performed
2012-08-24 Rig Released
2012-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-12 Well Began Production
2012-12-12 Well Fluid changed to Gas
2012-12-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-11 Precision Drilling Corporation 190 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-15 1817.80 Deviate (5 - 79 degrees)
2012-08-16 2142.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-23 Open Hole/Barefoot Completion 3745.80 3750.80 0
2012-08-24 Perforation 3639.10 3639.20 4
2012-08-24 Perforation 3726.20 3726.30 4
2012-10-03 Multi-Stage Fracture 2408.90 2409.00 0
2012-10-03 Multi-Stage Fracture 2552.40 2552.50 0
2012-10-03 Multi-Stage Fracture 2700.60 2700.70 0
2012-10-03 Multi-Stage Fracture 2853.40 2853.50 0
2012-10-03 Multi-Stage Fracture 3006.80 3006.90 0
2012-10-03 Multi-Stage Fracture 3160.20 3160.30 0
2012-10-03 Multi-Stage Fracture 3299.80 3299.90 0
2012-10-03 Multi-Stage Fracture 3525.40 3525.50 0
2012-08-24 Perforation 2408.90 2409.00 4
2012-10-03 Multi-Stage Fracture 3639.10 3639.20 0
2012-10-03 Multi-Stage Fracture 3726.20 3726.30 0
2012-08-24 Perforation 2552.40 2552.50 4
2012-08-24 Perforation 2700.60 2700.70 4
2012-08-24 Perforation 2853.40 2853.50 4
2012-08-24 Perforation 3006.80 3006.90 4
2012-08-24 Perforation 3160.20 3160.30 4
2012-08-24 Perforation 3299.80 3299.90 4
2012-08-24 Perforation 3525.40 3525.50 4

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 409 0.0 0.0 0.0
2013 8280 0.0 0.0 0.0
2014 8318 0.0 0.0 0.0
2015 8063 0.0 0.0 0.0
2016 8679 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8137 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-23 No Incident Encountered 0.00 0.00
2012-10-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References