X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425041512000

Well Details

Well ID: 0425041512000
Loading map...
Location: 00/12-15-042-04W5/0
Location Alias: 00/12-15-42-04 W5M
Location Alias 2: 00/12-15-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 15
County/Municipality: Ponoka County
Well Name: PCP LEEDALE 12-15-42-4
Operator Name: Ovintiv Canada ULC
License Number: 0082514
License Date: 1980-05-01
License Status: RecCertified
Spud Date: 1980-06-21
Final Drill Date: 1980-07-07
Well Total Depth: 2230.00 m
Surface Hole Latitude: 52.620088
Surface Hole Longitude: -114.499721

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-01 Obtained License
1980-06-27 Drill Stem Test Performed
1980-06-30 Kick Occurred
1980-07-07 Finished Drilling
1980-07-08 Well Log Performed
1980-07-09 Drill Stem Test Performed
1980-07-11 Production Casing Operation Performed
1980-11-06 Perforation Treatment Performed - Jet Perforation
1981-04-16 Well Mode changed to Drilled and Cased
1982-03-23 Well Began Production
1982-03-23 Well Fluid changed to Gas
1982-03-23 Well Mode changed to Flowing
1996-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-29 Plug Back Performed
1996-10-29 Well Fluid changed to Gas
1996-10-29 Well Mode changed to Abandoned Zone
1996-10-30 Well Log Performed
1996-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-31 Perforation Treatment Performed - Jet Perforation
1996-10-31 Perforation Treatment Performed - Remedial Casing
1996-10-31 Well Log Performed
1996-11-07 Well Abandoned
1996-11-07 Well Fluid changed to Gas
1996-11-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-06 Perforation 2063.00 2071.00 3
1980-11-06 Perforation 2077.00 2080.00 3
1996-10-29 Packing Device Capped w/Cement 2042.00 2050.00 0
1996-10-31 Perforation 415.00 416.00 13
1996-10-31 Remedial Casing Cementing 415.00 416.00 0
1996-10-31 Packing Device Capped w/Cement 360.00 385.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2896 0.0 0.0 0.0
1983 8675 0.0 0.0 0.0
1984 6893 0.0 0.0 0.0
1985 4634 0.0 0.0 0.0
1986 4557 0.0 0.0 0.0
1987 4379 0.0 0.0 0.0
1988 5154 0.0 0.0 0.0
1989 6116 0.0 0.0 0.0
1990 7454 0.0 0.0 0.0
1991 6090 0.0 0.0 0.0
1992 6865 0.0 0.0 0.0
1993 7124 0.0 0.0 0.0
1994 6600 0.0 0.0 0.0
1995 4890 0.0 0.0 0.0
1996 5465 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-06-30 Kick 1946.00 1946.00

For data sources see[6]

References