X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425041816030

Well Details

Well ID: 0425041816030
Loading map...
Location: 03/16-18-042-04W5/0
Location Alias: 03/16-18-42-04 W5M
Location Alias 2: 03/16-18-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 18
County/Municipality: Ponoka County
Well Name: BEC HZ WILSONCK 16-18-42-4
Operator Name: Bonavista Energy Corporation
License Number: 0477409
License Date: 2015-10-28
License Status: Issued
Spud Date: 2015-11-08
Final Drill Date: 2015-11-18
Well Total Depth: 4122.00 m
Surface Hole Latitude: 52.621531
Surface Hole Longitude: -114.527577

For data sources see[1][2]

Well History

Date Event
2015-10-28 Obtained License
2015-11-08 Surface Casing Operation Performed
2015-11-09 Direction Drilling Operation Performed - Deviate
2015-11-12 Direction Drilling Operation Performed - Horizontal
2015-11-13 Well Log Performed
2015-11-14 Intermediate Casing Operation Performed
2015-11-18 Finished Drilling
2015-11-18 Well Log Performed
2015-11-18 Well Mode changed to Drilled and Cased
2015-11-20 Liner Casing Operation Performed
2015-11-21 Perforation Treatment Performed - Open-Hole Completion
2015-11-21 Rig Released
2015-11-24 Well Log Performed
2015-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-01 Well Fluid changed to Gas
2015-12-01 Well Mode changed to Testing
2015-12-08 Well Began Production
2015-12-08 Well Fluid changed to Gas
2015-12-08 Well Mode changed to Flowing
2018-09-13 Well Fluid changed to Gas
2018-09-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-11-08 Savanna Drilling Corp. 631 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-11-09 1183.50 Deviate (5 - 79 degrees)
2015-11-12 2279.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-21 Open Hole/Barefoot Completion 4117.00 4122.00 0
2015-11-30 Multi-Stage Fracture 3133.30 3133.40 0
2015-11-30 Multi-Stage Fracture 3016.00 3016.10 0
2015-11-30 Multi-Stage Fracture 2888.30 2888.40 0
2015-11-30 Multi-Stage Fracture 2756.80 2756.90 0
2015-11-30 Multi-Stage Fracture 2639.50 2639.60 0
2015-11-30 Multi-Stage Fracture 2522.10 2522.20 0
2015-11-30 Multi-Stage Fracture 2393.10 2393.20 0
2015-11-30 Multi-Stage Fracture 4091.40 4091.50 0
2015-11-30 Multi-Stage Fracture 3996.00 3996.10 0
2015-11-30 Multi-Stage Fracture 3878.60 3878.70 0
2015-11-30 Multi-Stage Fracture 3748.10 3748.20 0
2015-11-30 Multi-Stage Fracture 3630.70 3630.80 0
2015-11-30 Multi-Stage Fracture 3499.30 3499.40 0
2015-11-30 Multi-Stage Fracture 3382.00 3382.10 0
2015-11-30 Multi-Stage Fracture 3264.70 3264.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-30 2015-11-30 2,107 3,305 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 3.5778 N/A
Water Not Available 100 78.4677 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 10.1518 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 7.4983 N/A
B-1008 Sanjel Bactericide/Biocide Broponol 52-51-7 100 0.0095 N/A
Methanol 67-56-1 100 0.0095 N/A
Non-Hazardous Ingredients Not Available 100 0.0095 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1614 N/A
Non-Hazardous Ingredients Not Available 100 0.1614 N/A
FRW-5 Sanjel Friction Reducer Alcohols. C11-14 iso. C13-rich. ethoxylated 78330-21-9 100 0.0593 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0593 N/A
Non-Hazardous Ingredients Not Available 100 0.0593 N/A
NE-5 Sanjel Surfactant 2-Propanol 67-63-0 100 0.0821 N/A
Alkyl benzenesulfonic acid 68584-22-5 100 0.0821 N/A
Diethylenetriamine 111-40-0 100 0.0821 N/A
Non-Hazardous Ingredients Not Available 100 0.0821 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-26 2015-11-28 Surface Water - River 2900

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 636 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 8526 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-18 No Incident Encountered 0.00 0.00
2015-12-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References