X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425043215000

Well Details

Well ID: 0425043215000
Loading map...
Location: 00/15-32-042-04W5/0
Location Alias: 00/15-32-42-04 W5M
Location Alias 2: 00/15-32-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 32
County/Municipality: Ponoka County
Well Name: GEAR HZ PEMBINA 15-32-42-4
Operator Name: Gear Energy Ltd.
License Number: 0482581
License Date: 2017-01-25
License Status: Issued
Spud Date: 2017-02-14
Final Drill Date: 2017-02-22
Well Total Depth: 2862.00 m
Surface Hole Latitude: 52.652145
Surface Hole Longitude: -114.540780

For data sources see[1][2]

Well History

Date Event
2017-01-25 Obtained License
2017-02-15 Surface Casing Operation Performed
2017-02-17 Direction Drilling Operation Performed - Deviate
2017-02-18 Direction Drilling Operation Performed - Horizontal
2017-02-18 Well Log Performed
2017-02-22 Finished Drilling
2017-02-22 Well Log Performed
2017-02-22 Well Mode changed to Drilled and Cased
2017-02-23 Intermediate Casing Operation Performed
2017-02-23 Production Casing Operation Performed
2017-02-23 Rig Released
2017-03-03 Well Log Performed
2017-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-24 Well Began Production
2017-03-24 Well Fluid changed to Crude Oil
2017-03-24 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-14 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-17 1031.60 Deviate (5 - 79 degrees)
2017-02-18 1428.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-20 Multi-Stage Fracture 2809.60 2810.70 0
2017-03-21 Multi-Stage Fracture 2156.00 2156.30 0
2017-03-21 Multi-Stage Fracture 2097.00 2097.30 0
2017-03-21 Multi-Stage Fracture 2044.00 2044.30 0
2017-03-21 Multi-Stage Fracture 1980.00 1980.30 0
2017-03-21 Multi-Stage Fracture 1923.00 1923.30 0
2017-03-21 Multi-Stage Fracture 1858.00 1858.30 0
2017-03-21 Multi-Stage Fracture 1800.00 1800.30 0
2017-03-21 Multi-Stage Fracture 1737.00 1737.30 0
2017-03-22 Multi-Stage Fracture 1678.00 1678.30 0
2017-03-22 Multi-Stage Fracture 1613.00 1613.30 0
2017-03-20 Multi-Stage Fracture 2648.00 2648.30 0
2017-03-22 Multi-Stage Fracture 1555.00 1555.30 0
2017-03-22 Multi-Stage Fracture 1495.00 1495.30 0
2017-03-21 Multi-Stage Fracture 2586.00 2586.30 0
2017-03-21 Multi-Stage Fracture 2529.00 2529.30 0
2017-03-21 Multi-Stage Fracture 2472.00 2472.30 0
2017-03-21 Multi-Stage Fracture 2415.00 2415.30 0
2017-03-21 Multi-Stage Fracture 2345.00 2345.30 0
2017-03-21 Multi-Stage Fracture 2283.00 2283.30 0
2017-03-21 Multi-Stage Fracture 2222.00 2222.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-20 2017-03-22 1,283 1,176 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 62.0059 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 23.4117 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 1.3835 N/A
Water 7732-18-5 100 1.3835 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0332 N/A
Methanol 67-56-1 100 0.0332 N/A
Water 7732-18-5 100 0.0332 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0092 N/A
ClayMix BJ Services Clay Control Choline chloride 67-48-1 100 0.1412 N/A
Complex polyamine salt 138879-94-4 100 0.1412 N/A
Non-hazardous Not Available 100 0.1412 N/A
Water 7732-18-5 100 0.1412 N/A
Nowferr 12 BJ Services Corrosion Inhibitor Methanol 67-56-1 100 0.0051 N/A
Non-hazardous Not Available 100 0.0051 N/A
Potassium iodide 7681-11-0 100 0.0051 N/A
Nowferr 3G BJ Services Corrosion Inhibitor 2-Propyn-1-ol. compd w methyloxirane 38172-91-7 100 0.0064 N/A
Non-hazardous Not Available 100 0.0064 N/A
Propargyl alcohol 107-19-7 100 0.0064 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0.0001 N/A
Non-hazardous Not Available 100 0.0001 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0.0001 N/A
Water 7732-18-5 100 0.0001 N/A
AS-330 BJ Services Demulsifier Alkyl benzene sulphonic acid 27176-87-0 100 0.0054 N/A
Methanol 67-56-1 100 0.0054 N/A
Sulphonic acid. alkyl aryl derivative 147732-59-0 100 0.0054 N/A
Sulphuric acid 7664-93-9 100 0.0054 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.053 N/A
Isopropanol 67-63-0 100 0.053 N/A
Methanol 67-56-1 100 0.053 N/A
NE-207 BJ Services Demulsifier Methanol 67-56-1 100 0.0013 N/A
Sulphonic acid. alkyl aryl derivative 147732-59-0 100 0.0013 N/A
Sulphuric acid 7664-93-9 100 0.0013 N/A
Nitrogen BJ Services Energizing Fluid Nitrogen 7727-37-9 100 12.477 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.2213 N/A
Oxyalkylated alcohol 9014 100 0.2213 N/A
Petroleum distillates 64742-47-8 100 0.2213 N/A
Polyacrylate 9014 100 0.2213 N/A
Nowferr 1 BJ Services Iron Control Sodium hypophosphite 10039-56-2 100 0.0271 N/A
Nowferr 14P BJ Services Iron Control Cupric sulphate. pentahydrate 7758-99-8 100 0.0016 N/A
FAW-26 BJ Services Surfactant 1-Butoxy-2-propanol 5131-66-8 100 0.0865 N/A
Diethanolamine 111-42-2 100 0.0865 N/A
Ethanol 64-17-5 100 0.0865 N/A
Methanol 67-56-1 100 0.0865 N/A
Polyoxyalkylene sulfate 68891-29-2 100 0.0865 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-03-16 2017-03-16 Surface Water - Runoff 863
2017-03-15 2017-03-17 Surface Water - Runoff 489

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5443 0.0 0.0 0.0
2018 7132 0.0 0.0 0.0
2019 7859 0.0 0.0 0.0
2020 2045 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-23 No Incident Encountered 0.00 0.00
2017-03-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References