X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425043608020

Well Details

Well ID: 0425043608020
Loading map...
Location: 02/08-36-042-04W5/0
Location Alias: 02/08-36-42-04 W5M
Location Alias 2: 02/08-36-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 36
County/Municipality: Ponoka County
Well Name: TQN ET AL HZ 103 WILSONCK 8-36-42-4
Operator Name: TAQA North Ltd.
License Number: 0438740
License Date: 2011-11-14
License Status: Amended
Spud Date: 2011-12-02
Final Drill Date: 2011-12-13
Well Total Depth: 3540.00 m
Surface Hole Latitude: 52.671603
Surface Hole Longitude: -114.431391

For data sources see[1][2]

Well History

Date Event
2011-11-14 Obtained License
2011-12-03 Surface Casing Operation Performed
2011-12-06 Direction Drilling Operation Performed - Deviate
2011-12-08 Direction Drilling Operation Performed - Horizontal
2011-12-13 Finished Drilling
2011-12-13 Production Casing Operation Performed
2011-12-13 Well Mode changed to Drilled and Cased
2011-12-15 Perforation Treatment Performed - Open-Hole Completion
2011-12-15 Rig Released
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Testing
2012-02-07 Well Log Performed
2012-02-16 Perforation Treatment Performed - Jet Perforation
2012-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-04 Well Began Production
2012-04-04 Well Fluid changed to Gas
2012-04-04 Well Mode changed to Flowing
2018-11-01 Well Fluid changed to Gas
2018-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-06 1814.00 Deviate (5 - 79 degrees)
2011-12-08 2168.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-15 Open Hole/Barefoot Completion 3537.00 3540.00 0
2012-02-18 Multi-Stage Fracture 2375.00 2375.10 0
2012-02-16 Perforation 3333.00 3335.00 8
2012-02-16 Perforation 3303.00 3305.00 8
2012-02-17 Multi-Stage Fracture 3333.00 3335.00 0
2012-02-17 Multi-Stage Fracture 3165.00 3165.10 0
2012-02-17 Multi-Stage Fracture 3020.00 3020.10 0
2012-02-17 Multi-Stage Fracture 2855.00 2855.10 0
2012-02-17 Multi-Stage Fracture 2705.00 2705.10 0
2012-02-18 Multi-Stage Fracture 2530.00 2530.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6452 0.0 0.0 0.0
2013 8442 0.0 0.0 0.0
2014 8351 0.0 0.0 0.0
2015 8232 0.0 0.0 0.0
2016 8534 0.0 0.0 0.0
2017 8128 0.0 0.0 0.0
2018 8281 0.0 0.0 0.0
2019 7739 0.0 0.0 0.0
2020 1970 0.0 0.0 0.0

For data sources see[6]

References