X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425051508000

Well Details

Well ID: 0425051508000
Loading map...
Location: 00/08-15-042-05W5/0
Location Alias: 00/08-15-42-05 W5M
Location Alias 2: 00/08-15-042-05 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 15
County/Municipality: Ponoka County
Well Name: WHITECAP WILLGR 8-15-42-5
Operator Name: Gear Energy Ltd.
License Number: 0129734
License Date: 1987-10-28
License Status: RecCertified
Spud Date: 1987-12-13
Final Drill Date: 1988-01-07
Well Total Depth: 2243.00 m
Surface Hole Latitude: 52.617436
Surface Hole Longitude: -114.630911

For data sources see[1][2]

Well History

Date Event
1987-10-28 Obtained License
1987-12-13 Lost Circulation Occurred
1987-12-16 Surface Casing Operation Performed
1987-12-23 Drill Stem Test Performed
1988-01-07 Finished Drilling
1988-01-07 Well Mode changed to Drilled and Cased
1988-01-09 Well Log Performed
1988-01-10 Well Log Performed
1988-01-11 Production Casing Operation Performed
1988-01-12 Rig Released
1988-03-05 Well Log Performed
1988-03-09 Perforation Treatment Performed - Jet Perforation
1988-03-09 Well Log Performed
1988-03-14 Perforation Treatment Performed - Fractured
1988-03-31 Well Log Performed
1988-05-28 Perforation Treatment Performed - Jet Perforation
1988-05-28 Well Log Performed
1988-05-29 Perforation Treatment Performed - Fractured
1988-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-29 Plug Back Performed
1988-10-01 Perforation Treatment Performed - Jet Perforation
1988-10-03 Perforation Treatment Performed - Fractured
1988-12-30 Well Began Production
1988-12-30 Well Fluid changed to Crude Oil
1988-12-30 Well Mode changed to Pumping
1989-01-29 Well Fluid changed to Crude Oil
1989-01-29 Well Mode changed to Suspended
1997-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-26 Perforation Treatment Performed - Jet Perforation
1997-09-26 Plug Back Performed
1997-09-26 Well Fluid changed to Crude Oil
1997-09-26 Well Log Performed
1997-09-26 Well Mode changed to Abandoned Zone
1997-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-10 Perforation Treatment Performed - Remedial Casing
1998-05-19 Well Abandoned
1998-05-19 Well Fluid changed to Crude Oil
1998-05-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-09 Perforation 2139.00 2144.00 13
1997-09-26 Perforation 450.00 451.00 13
1997-10-10 Remedial Casing Cementing 450.00 451.00 0
1997-10-10 Packing Device Capped w/Cement 350.00 460.00 0
1988-03-09 Perforation 2156.00 2159.00 13
1988-03-14 Fracture 2139.00 2159.00 0
1988-05-28 Perforation 2139.00 2144.00 13
1988-05-29 Fracture 2139.00 2144.00 0
1988-09-29 Packing Device Capped w/Cement 2122.00 2130.00 0
1988-10-01 Perforation 1324.00 1328.00 13
1988-10-03 Fracture 1324.00 1328.00 0
1997-09-26 Packing Device Capped w/Cement 1302.00 1310.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 588 0.0 0.0 0.0
1989 683 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-12-13 Lost Circulation 32.00 56.00

For data sources see[6]

References