X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434173403000

Well Details

Well ID: 0434173403000
Loading map...
Location: 00/03-34-043-17W4/0
Location Alias: 00/03-34-43-17 W4M
Location Alias 2: 00/03-34-043-17 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 17
Section: 34
County/Municipality: Camrose County
Well Name: RIFE HOLMBERG 3-34-43-17
Operator Name: Rife Resources Ltd.
License Number: 0143045
License Date: 1990-01-31
License Status: Abandoned
Spud Date: 1990-02-24
Final Drill Date: 1990-02-28
Well Total Depth: 1159.50 m
Surface Hole Latitude: 52.744302
Surface Hole Longitude: -112.391931

For data sources see[1][2]

Well History

Date Event
1990-01-31 Obtained License
1990-02-25 Surface Casing Operation Performed
1990-02-28 Finished Drilling
1990-03-01 Drill Stem Test Performed
1990-03-01 Well Log Performed
1990-03-02 Production Casing Operation Performed
1990-03-02 Rig Released
1990-03-10 Well Log Performed
1990-03-11 Perforation Treatment Performed - Jet Perforation
1990-03-15 Well Mode changed to Drilled and Cased
1990-05-25 Well Log Performed
1990-06-01 Perforation Treatment Performed - Jet Perforation
1990-06-01 Well Log Performed
1990-06-02 Perforation Treatment Performed - Cement Squeeze
1990-06-05 Perforation Treatment Performed - Jet Perforation
1990-06-05 Well Log Performed
1991-02-01 Well Began Production
1991-02-01 Well Fluid changed to Gas
1991-02-01 Well Mode changed to Flowing
1992-11-06 Well Log Performed
1992-11-07 Perforation Treatment Performed - Jet Perforation
1993-08-01 Well Log Performed
1993-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-02 Plug Back Performed
1993-08-02 Well Fluid changed to Gas
1993-08-02 Well Log Performed
1993-08-02 Well Mode changed to Abandoned Zone
1993-08-03 Perforation Treatment Performed - Jet Perforation
1995-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-17 Plug Back Performed
1995-08-17 Well Abandoned
1995-08-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-11 Perforation 1082.00 1083.00 14
1993-08-02 Packing Device Capped w/Cement 1063.00 1071.00 0
1993-08-03 Perforation 1056.00 1057.00 13
1995-08-17 Packing Device Capped w/Cement 1043.00 1051.00 0
1990-03-11 Perforation 1083.50 1084.20 14
1990-03-11 Perforation 1085.00 1086.00 14
1990-06-01 Perforation 1090.50 1091.50 13
1990-06-02 Cement Squeeze 1082.00 1091.50 0
1990-06-05 Perforation 1082.00 1083.00 14
1990-06-05 Perforation 1083.50 1084.20 14
1992-11-07 Perforation 1072.00 1073.50 14
1992-11-07 Perforation 1075.00 1077.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5470 0.0 0.0 0.0
1992 2795 0.0 0.0 0.0
1993 1340 0.0 0.0 0.0

For data sources see[5]

References