0434193310000

Well Details

Well ID: 0434193310000
Loading map...
Location: 00/10-33-043-19W4/0
Location Alias: 00/10-33-43-19 W4M
Location Alias 2: 00/10-33-043-19 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 19
Section: 33
County/Municipality: Camrose County
Well Name: AQUEST DONALDA 10-33-43-19
Operator Name: Canadian Natural Resources Limited
License Number: 0178048
License Date: 1995-05-19
License Status: Abandoned
Spud Date: 1995-10-13
Final Drill Date: 1995-10-18
Well Total Depth: 1335.00 m
Surface Hole Latitude: 52.750447
Surface Hole Longitude: -112.700260

For data sources see[1][2]

Well History

Date Event
1995-05-19 Obtained License
1995-10-14 Surface Casing Operation Performed
1995-10-15 Direction Drilling Operation Performed - Deviate
1995-10-18 Drill Stem Test Performed
1995-10-18 Finished Drilling
1995-10-18 Well Log Performed
1995-10-19 Production Casing Operation Performed
1995-10-19 Rig Released
1995-10-19 Well Mode changed to Drilled and Cased
1995-11-08 Well Log Performed
1995-11-24 Perforation Treatment Performed - Jet Perforation
1995-11-25 Perforation Treatment Performed - Jet Perforation
1999-07-01 Well Began Production
1999-07-01 Well Fluid changed to Gas
1999-07-01 Well Mode changed to Flowing
2000-01-13 Well Fluid changed to Gas
2000-01-13 Well Mode changed to Suspended
2000-11-29 Well Fluid changed to Gas
2000-11-29 Well Mode changed to Flowing
2001-09-01 Well Fluid changed to Gas
2001-09-01 Well Mode changed to Suspended
2001-09-07 Perforation Treatment Performed - Jet Perforation
2003-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-31 Perforation Treatment Performed - Jet Perforation
2003-05-31 Plug Back Performed
2003-05-31 Well Fluid changed to Gas
2003-05-31 Well Mode changed to Abandoned Zone
2003-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-11 Plug Back Performed
2003-08-12 Perforation Treatment Performed - Jet Perforation
2012-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-28 Plug Back Performed
2015-12-05 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-15 552.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-24 Perforation 1273.00 1274.00 13
2003-08-12 Perforation 346.00 349.00 13
2003-08-12 Perforation 298.00 300.50 13
2012-09-28 Packing Device Capped w/Cement 282.00 290.00 0
1995-11-25 Perforation 1247.00 1248.00 13
1995-11-25 Perforation 1252.50 1253.00 13
2001-09-07 Perforation 1209.50 1211.00 13
2001-09-07 Perforation 1213.50 1217.00 13
2003-05-31 Packing Device Capped w/Cement 1260.00 1269.00 0
2003-05-31 Perforation 1248.00 1249.00 13
2003-08-11 Packing Device Capped w/Cement 1236.00 1245.00 0
2003-08-11 Packing Device Capped w/Cement 1194.00 1203.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3033 0.0 0.0 0.0
2000 303 0.0 0.0 0.0
2001 1803 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-04 No Incident Encountered 0.00 0.00

For data sources see[7]