X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434220210000

Well Details

Well ID: 0434220210000
Loading map...
Location: 00/10-02-043-22W4/0
Location Alias: 00/10-02-43-22 W4M
Location Alias 2: 00/10-02-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 02
County/Municipality: Ponoka County
Well Name: EMBER MALMO 10-2-43-22
Operator Name: Ember Resources Inc.
License Number: 0339261
License Date: 2005-10-04
License Status: Issued
Spud Date: 2006-01-20
Final Drill Date: 2006-01-21
Well Total Depth: 395.00 m
Surface Hole Latitude: 52.678747
Surface Hole Longitude: -113.083515

For data sources see[1][2]

Well History

Date Event
2005-10-04 Obtained License
2006-01-20 Surface Casing Operation Performed
2006-01-21 Finished Drilling
2006-01-21 Production Casing Operation Performed
2006-01-21 Rig Released
2006-01-21 Well Mode changed to Drilled and Cased
2006-01-29 Well Log Performed
2006-02-12 Perforation Treatment Performed - Jet Perforation
2006-02-12 Well Log Performed
2006-02-26 Perforation Treatment Performed - Fractured
2006-06-06 Well Began Production
2006-06-06 Well Fluid changed to Coalbed Methane-Coals and Other
2006-06-06 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-12 Perforation 363.00 365.00 13
2006-02-12 Perforation 275.00 276.00 13
2006-02-12 Perforation 271.50 272.50 13
2006-02-12 Perforation 266.00 268.00 13
2006-02-12 Perforation 247.00 249.00 13
2006-02-12 Perforation 242.00 243.00 13
2006-02-12 Perforation 235.00 238.00 13
2006-02-12 Perforation 227.50 228.50 13
2006-02-26 Fracture 363.00 365.00 0
2006-02-26 Fracture 343.00 347.00 0
2006-02-26 Fracture 327.50 328.50 0
2006-02-12 Perforation 343.00 347.00 13
2006-02-26 Fracture 323.50 324.50 0
2006-02-26 Fracture 309.50 310.50 0
2006-02-26 Fracture 304.00 305.00 0
2006-02-26 Fracture 292.50 293.50 0
2006-02-26 Fracture 278.00 281.00 0
2006-02-26 Fracture 271.50 276.00 0
2006-02-26 Fracture 266.00 268.00 0
2006-02-26 Fracture 247.00 249.00 0
2006-02-26 Fracture 242.00 243.00 0
2006-02-26 Fracture 235.00 238.00 0
2006-02-12 Perforation 327.50 328.50 13
2006-02-26 Fracture 227.50 228.50 0
2006-02-12 Perforation 323.50 324.50 13
2006-02-12 Perforation 309.50 310.50 13
2006-02-12 Perforation 304.00 305.00 13
2006-02-12 Perforation 292.50 293.50 13
2006-02-12 Perforation 280.00 281.00 13
2006-02-12 Perforation 278.00 279.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4774 0.0 0.0 0.0
2007 8409 0.0 0.0 0.0
2008 8253 0.0 0.0 0.0
2009 8647 0.0 0.0 0.0
2010 8703 0.0 0.0 0.0
2011 8089 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8367 0.0 0.0 0.0
2017 8232 0.0 0.0 0.0
2018 8661 0.0 0.0 0.0
2019 8250 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[5]

References