X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434220309000

Well Details

Well ID: 0434220309000
Loading map...
Location: 00/09-03-043-22W4/0
Location Alias: 00/09-03-43-22 W4M
Location Alias 2: 00/09-03-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 03
County/Municipality: Ponoka County
Well Name: EMBER ET AL MALMO 9-3-43-22
Operator Name: Ember Resources Inc.
License Number: 0341130
License Date: 2005-10-27
License Status: Issued
Spud Date: 2005-11-06
Final Drill Date: 2005-11-07
Well Total Depth: 630.00 m
Surface Hole Latitude: 52.679531
Surface Hole Longitude: -113.104760

For data sources see[1][2]

Well History

Date Event
2005-10-27 Obtained License
2005-11-07 Finished Drilling
2005-11-07 Surface Casing Operation Performed
2005-11-07 Well Mode changed to Drilled and Cased
2005-11-08 Production Casing Operation Performed
2005-11-08 Rig Released
2005-11-10 Well Log Performed
2005-11-12 Perforation Treatment Performed - Jet Perforation
2005-11-12 Well Log Performed
2005-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-13 Plug Back Performed
2005-11-13 Well Mode changed to Abandoned Zone
2005-11-14 Perforation Treatment Performed - Jet Perforation
2005-11-19 Perforation Treatment Performed - Jet Perforation
2005-11-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-12 Perforation 599.80 601.00 14
2005-11-14 Perforation 364.00 366.00 14
2005-11-14 Perforation 356.20 358.00 14
2005-11-14 Perforation 353.30 355.10 14
2005-11-19 Perforation 332.50 333.90 7
2005-11-19 Perforation 327.00 328.00 7
2005-11-19 Perforation 314.00 315.00 7
2005-11-19 Perforation 308.00 309.50 7
2005-11-19 Perforation 296.00 297.00 7
2005-11-19 Perforation 282.60 285.80 7
2005-11-19 Perforation 277.60 278.60 7
2005-11-12 Perforation 593.00 595.50 14
2005-11-19 Perforation 269.20 271.10 7
2005-11-19 Perforation 256.00 257.00 7
2005-11-19 Perforation 251.40 252.80 7
2005-11-19 Perforation 236.00 238.60 7
2005-11-19 Perforation 228.00 229.00 7
2005-11-19 Perforation 220.00 222.50 7
2005-11-19 Perforation 217.50 218.30 7
2005-11-20 Fracture 353.30 407.00 0
2005-11-20 Fracture 217.50 333.90 0
2005-11-12 Perforation 589.00 590.50 14
2005-11-13 Packing Device Capped w/Cement 578.00 586.00 0
2005-11-14 Perforation 406.00 407.00 14
2005-11-14 Perforation 398.30 400.80 14
2005-11-14 Perforation 395.20 397.00 14
2005-11-14 Perforation 392.40 394.20 14
2005-11-14 Perforation 368.20 370.00 14

For data sources see[4]



References