If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434220805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.687015,"lon":-113.166882,"icon":""}]} |
Location: 00/05-08-043-22W4/0 | |
Location Alias: 00/05-08-43-22 W4M | |
Location Alias 2: 00/05-08-043-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 08 | |
County/Municipality: Ponoka County | |
Well Name: EMBER ET AL MALMO 5-8-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411443 | |
License Date: 2009-07-15 | |
License Status: Amended | |
Spud Date: 2009-07-29 | |
Final Drill Date: 2009-07-30 | |
Well Total Depth: 700.00 m | |
Surface Hole Latitude: 52.687015 | |
Surface Hole Longitude: -113.166882 |
Date | Event |
---|---|
2009-07-15 | Obtained License |
2009-07-29 | Surface Casing Operation Performed |
2009-07-30 | Finished Drilling |
2009-07-30 | Well Mode changed to Drilled and Cased |
2009-07-31 | Production Casing Operation Performed |
2009-07-31 | Rig Released |
2009-08-02 | Well Log Performed |
2009-08-22 | Perforation Treatment Performed - Jet Perforation |
2009-08-22 | Well Log Performed |
2009-08-26 | Perforation Treatment Performed - Fractured |
2009-08-31 | Well Began Production |
2009-08-31 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-08-31 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-08-22 | Perforation | 340.80 | 341.80 | 13 |
2009-08-22 | Perforation | 287.80 | 288.80 | 13 |
2009-08-22 | Perforation | 278.50 | 280.00 | 13 |
2009-08-22 | Perforation | 273.50 | 275.00 | 13 |
2009-08-22 | Perforation | 266.80 | 267.30 | 13 |
2009-08-22 | Perforation | 263.00 | 264.00 | 13 |
2009-08-22 | Perforation | 259.00 | 260.00 | 13 |
2009-08-22 | Perforation | 249.00 | 251.00 | 13 |
2009-08-22 | Perforation | 241.50 | 243.00 | 13 |
2009-08-22 | Perforation | 231.80 | 232.80 | 13 |
2009-08-22 | Perforation | 228.00 | 229.50 | 13 |
2009-08-22 | Perforation | 337.80 | 338.30 | 13 |
2009-08-22 | Perforation | 576.50 | 577.50 | 17 |
2009-08-22 | Perforation | 461.50 | 464.00 | 17 |
2009-08-22 | Perforation | 458.00 | 459.00 | 17 |
2009-08-22 | Perforation | 411.00 | 413.00 | 17 |
2009-08-22 | Perforation | 407.50 | 409.00 | 17 |
2009-08-22 | Perforation | 395.00 | 397.00 | 17 |
2009-08-22 | Perforation | 376.50 | 378.00 | 17 |
2009-08-26 | Fracture | 340.80 | 341.80 | 0 |
2009-08-26 | Fracture | 337.80 | 338.30 | 0 |
2009-08-26 | Fracture | 333.70 | 334.20 | 0 |
2009-08-22 | Perforation | 333.70 | 334.20 | 13 |
2009-08-26 | Fracture | 324.50 | 325.50 | 0 |
2009-08-26 | Fracture | 318.50 | 319.50 | 0 |
2009-08-26 | Fracture | 313.00 | 315.00 | 0 |
2009-08-26 | Fracture | 306.00 | 308.50 | 0 |
2009-08-26 | Fracture | 297.00 | 298.00 | 0 |
2009-08-26 | Fracture | 295.00 | 296.00 | 0 |
2009-08-26 | Fracture | 287.80 | 288.80 | 0 |
2009-08-26 | Fracture | 278.50 | 280.00 | 0 |
2009-08-26 | Fracture | 273.50 | 275.00 | 0 |
2009-08-26 | Fracture | 266.80 | 267.30 | 0 |
2009-08-22 | Perforation | 324.50 | 325.50 | 13 |
2009-08-26 | Fracture | 263.00 | 264.00 | 0 |
2009-08-26 | Fracture | 259.00 | 260.00 | 0 |
2009-08-26 | Fracture | 249.00 | 251.00 | 0 |
2009-08-26 | Fracture | 241.50 | 243.00 | 0 |
2009-08-26 | Fracture | 231.80 | 232.80 | 0 |
2009-08-26 | Fracture | 228.00 | 229.50 | 0 |
2009-08-22 | Perforation | 318.50 | 319.50 | 13 |
2009-08-22 | Perforation | 313.00 | 315.00 | 13 |
2009-08-22 | Perforation | 306.00 | 308.50 | 13 |
2009-08-22 | Perforation | 297.00 | 298.00 | 13 |
2009-08-22 | Perforation | 295.00 | 296.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 2933 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8599 | 0.0 | 0.0 | 0.0 |
2012 | 8749 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8718 | 0.0 | 0.0 | 0.0 |
2015 | 8706 | 0.0 | 0.0 | 0.0 |
2016 | 8674 | 0.0 | 0.0 | 0.0 |
2017 | 8702 | 0.0 | 0.0 | 0.0 |
2018 | 8706 | 0.0 | 0.0 | 0.0 |
2019 | 7605 | 0.0 | 0.0 | 0.0 |
2020 | 1823 | 0.0 | 0.0 | 0.0 |
For data sources see[5]