X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434221416002

Well Details

Well ID: 0434221416002
Loading map...
Location: 00/16-14-043-22W4/2
Location Alias: 00/16-14-43-22 W4M
Location Alias 2: 00/16-14-043-22 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 14
County/Municipality: Ponoka County
Well Name: EMBER MALMO 16-14-43-22
Operator Name: Ember Resources Inc.
License Number: 0319619
License Date: 2004-11-24
License Status: Issued
Spud Date: 2005-01-16
Final Drill Date: 2005-02-13
Well Total Depth: 505.00 m
Surface Hole Latitude: 52.710440
Surface Hole Longitude: -113.081138

For data sources see[1][2]

Well History

Date Event
2004-11-24 Obtained License
2005-01-16 Surface Casing Operation Performed
2005-02-13 Finished Drilling
2005-02-13 Production Casing Operation Performed
2005-02-13 Well Mode changed to Drilled and Cased
2005-02-14 Rig Released
2005-02-20 Well Log Performed
2005-02-22 Perforation Treatment Performed - Jet Perforation
2005-02-25 Perforation Treatment Performed - Jet Perforation
2005-02-26 Well Log Performed
2005-02-27 Perforation Treatment Performed - Jet Perforation
2005-03-02 Perforation Treatment Performed - Fractured
2005-05-06 Well Began Production
2005-05-06 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-06 Well Mode changed to Flowing
2010-08-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-22 Perforation 357.50 359.50 14
2005-02-27 Perforation 218.50 219.00 7
2005-02-27 Perforation 221.80 223.10 7
2005-02-27 Perforation 227.40 227.80 7
2005-02-27 Perforation 233.00 234.40 7
2005-02-27 Perforation 237.70 238.10 7
2005-02-27 Perforation 249.60 250.00 7
2005-02-27 Perforation 251.00 252.40 7
2005-02-27 Perforation 256.50 257.00 7
2005-02-27 Perforation 257.60 258.00 7
2005-02-27 Perforation 261.00 261.40 7
2005-02-22 Perforation 390.50 392.70 14
2005-02-27 Perforation 265.30 266.00 7
2005-02-27 Perforation 267.40 267.90 7
2005-02-27 Perforation 279.50 280.20 7
2005-02-27 Perforation 283.00 283.40 7
2005-02-27 Perforation 295.20 296.10 7
2005-02-27 Perforation 300.80 301.50 7
2005-02-27 Perforation 310.80 311.20 7
2005-02-27 Perforation 314.90 315.20 7
2005-02-27 Perforation 316.40 316.80 7
2005-03-02 Fracture 200.80 316.80 0
2005-02-22 Perforation 403.00 407.50 14
2005-02-25 Perforation 354.50 355.50 14
2005-02-25 Perforation 352.50 353.50 14
2005-02-27 Perforation 200.80 201.80 7
2005-02-27 Perforation 205.20 205.60 7
2005-02-27 Perforation 206.00 206.50 7
2005-02-27 Perforation 208.30 209.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5291 0.0 0.0 0.0
2006 8351 0.0 0.0 0.0
2007 8018 0.0 0.0 0.0
2008 7747 0.0 0.0 0.0
2009 7576 0.0 0.0 0.0
2010 4571 0.0 0.0 0.0

For data sources see[5]

References