X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434221510000

Well Details

Well ID: 0434221510000
Loading map...
Location: 00/10-15-043-22W4/0
Location Alias: 00/10-15-43-22 W4M
Location Alias 2: 00/10-15-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 15
County/Municipality: Ponoka County
Well Name: EMBER ET AL MALMO 10-15-43-22
Operator Name: Ember Resources Inc.
License Number: 0360140
License Date: 2006-07-13
License Status: Issued
Spud Date: 2006-08-28
Final Drill Date: 2006-08-29
Well Total Depth: 707.00 m
Surface Hole Latitude: 52.708033
Surface Hole Longitude: -113.107838

For data sources see[1][2]

Well History

Date Event
2006-07-13 Obtained License
2006-08-28 Surface Casing Operation Performed
2006-08-29 Finished Drilling
2006-08-29 Production Casing Operation Performed
2006-08-29 Well Log Performed
2006-08-29 Well Mode changed to Drilled and Cased
2006-08-30 Rig Released
2006-09-10 Perforation Treatment Performed - Jet Perforation
2006-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-10 Perforation Treatment Performed - Jet Perforation
2006-10-10 Plug Back Performed
2006-10-10 Well Log Performed
2006-10-10 Well Mode changed to Abandoned Zone
2006-12-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-09-10 Perforation 380.00 382.00 14
2006-10-10 Perforation 303.80 304.40 7
2006-10-10 Perforation 299.20 300.00 7
2006-10-10 Perforation 293.40 294.40 7
2006-10-10 Perforation 282.00 282.80 7
2006-10-10 Perforation 278.80 279.80 7
2006-10-10 Perforation 269.90 271.00 7
2006-10-10 Perforation 267.60 269.00 7
2006-10-10 Perforation 261.40 263.20 7
2006-10-10 Perforation 258.80 260.60 7
2006-10-10 Perforation 257.60 258.00 7
2006-09-10 Perforation 370.00 373.00 14
2006-10-10 Perforation 246.00 247.00 7
2006-10-10 Perforation 241.40 242.80 7
2006-10-10 Perforation 238.40 239.00 7
2006-10-10 Perforation 234.00 234.80 7
2006-10-10 Perforation 227.40 230.60 7
2006-10-10 Perforation 219.80 221.40 7
2006-10-10 Perforation 217.20 217.80 7
2006-10-10 Perforation 214.40 216.60 7
2006-10-10 Perforation 211.00 211.60 7
2006-12-09 Fracture 278.80 317.40 0
2006-09-10 Perforation 367.00 369.00 14
2006-12-09 Fracture 211.00 271.00 0
2006-09-10 Perforation 355.00 358.00 14
2006-09-10 Perforation 350.00 353.00 14
2006-10-10 Packing Device Capped w/Cement 339.00 347.00 0
2006-10-10 Perforation 316.40 317.40 7
2006-10-10 Perforation 314.80 315.40 7
2006-10-10 Perforation 308.40 310.40 7

For data sources see[4]



References