X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434222006022

Well Details

Well ID: 0434222006022
Loading map...
Location: 02/06-20-043-22W4/2
Location Alias: 02/06-20-43-22 W4M
Location Alias 2: 02/06-20-043-22 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 20
County/Municipality: Ponoka County
Well Name: EMBER 102 MALMO 6-20-43-22
Operator Name: Ember Resources Inc.
License Number: 0346586
License Date: 2005-12-22
License Status: Issued
Spud Date: 2006-03-01
Final Drill Date: 2006-03-02
Well Total Depth: 643.00 m
Surface Hole Latitude: 52.716341
Surface Hole Longitude: -113.162963

For data sources see[1][2]

Well History

Date Event
2005-12-22 Obtained License
2006-03-01 Surface Casing Operation Performed
2006-03-02 Finished Drilling
2006-03-02 Production Casing Operation Performed
2006-03-02 Rig Released
2006-03-02 Well Log Performed
2006-03-02 Well Mode changed to Drilled and Cased
2006-03-07 Perforation Treatment Performed - Jet Perforation
2006-03-10 Perforation Treatment Performed - Fractured
2006-05-26 Well Began Production
2006-05-26 Well Fluid changed to Coalbed Methane-Coals Only
2006-05-26 Well Mode changed to Flowing
2017-04-25 Well Fluid changed to Coalbed Methane-Coals Only
2017-04-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-07 Perforation 621.80 622.40 7
2006-03-07 Perforation 327.80 328.30 7
2006-03-07 Perforation 325.60 326.10 7
2006-03-07 Perforation 314.60 315.00 7
2006-03-07 Perforation 311.50 311.90 7
2006-03-07 Perforation 300.30 303.00 7
2006-03-07 Perforation 291.80 293.00 7
2006-03-07 Perforation 284.80 286.20 7
2006-03-07 Perforation 271.80 272.30 7
2006-03-07 Perforation 268.80 269.50 7
2006-03-07 Perforation 262.70 263.00 7
2006-03-07 Perforation 617.00 618.00 7
2006-03-07 Perforation 259.20 259.60 7
2006-03-07 Perforation 255.40 255.80 7
2006-03-07 Perforation 252.80 254.40 7
2006-03-07 Perforation 251.40 252.00 7
2006-03-07 Perforation 241.00 242.00 7
2006-03-07 Perforation 235.40 239.00 7
2006-03-07 Perforation 229.30 229.80 7
2006-03-10 Fracture 591.30 622.40 0
2006-03-10 Fracture 229.30 349.40 0
2006-03-07 Perforation 613.00 613.70 7
2006-03-07 Perforation 603.10 604.00 7
2006-03-07 Perforation 593.40 594.20 7
2006-03-07 Perforation 591.30 592.00 7
2006-03-07 Perforation 348.60 349.40 7
2006-03-07 Perforation 344.40 346.00 7
2006-03-07 Perforation 332.40 333.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5242 0.0 0.0 0.0
2007 8124 0.0 0.0 0.0
2008 8373 0.0 0.0 0.0
2009 8087 0.0 0.0 0.0
2010 7931 0.0 0.0 0.0
2011 8589 0.0 0.0 0.0
2012 8749 0.0 0.0 0.0
2013 7787 0.0 0.0 0.0
2014 7588 0.0 0.0 0.0
2015 8194 0.0 0.0 0.0
2016 6204 0.0 0.0 0.0
2017 4618 0.0 0.0 0.0
2018 5678 0.0 0.0 0.0
2019 5294 0.0 0.0 0.0
2020 618 0.0 0.0 0.0

For data sources see[5]

References