X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434222108000

Well Details

Well ID: 0434222108000
Loading map...
Location: 00/08-21-043-22W4/0
Location Alias: 00/08-21-43-22 W4M
Location Alias 2: 00/08-21-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 21
County/Municipality: Ponoka County
Well Name: EMBER MALMO 8-21-43-22
Operator Name: Ember Resources Inc.
License Number: 0341081
License Date: 2005-10-26
License Status: Issued
Spud Date: 2005-12-09
Final Drill Date: 2005-12-10
Well Total Depth: 652.00 m
Surface Hole Latitude: 52.717230
Surface Hole Longitude: -113.127682

For data sources see[1][2]

Well History

Date Event
2005-10-26 Obtained License
2005-12-10 Finished Drilling
2005-12-10 Production Casing Operation Performed
2005-12-10 Rig Released
2005-12-10 Surface Casing Operation Performed
2005-12-10 Well Mode changed to Drilled and Cased
2005-12-13 Well Log Performed
2005-12-19 Perforation Treatment Performed - Jet Perforation
2005-12-22 Perforation Treatment Performed - Jet Perforation
2006-01-06 Perforation Treatment Performed - Jet Perforation
2006-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-10 Perforation Treatment Performed - Jet Perforation
2006-01-10 Plug Back Performed
2006-01-10 Well Mode changed to Abandoned Zone
2006-01-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-19 Perforation 577.00 578.20 14
2006-01-10 Perforation 308.80 309.50 7
2006-01-10 Perforation 300.50 301.00 7
2006-01-10 Perforation 288.50 290.10 7
2006-01-10 Perforation 284.50 285.20 7
2006-01-10 Perforation 278.10 278.80 7
2006-01-10 Perforation 276.40 277.40 7
2006-01-10 Perforation 270.70 271.50 7
2006-01-10 Perforation 266.20 267.80 7
2006-01-10 Perforation 250.20 250.90 7
2006-01-10 Perforation 245.70 247.70 7
2005-12-22 Perforation 577.00 580.50 14
2006-01-10 Perforation 243.70 244.30 7
2006-01-10 Perforation 239.10 239.90 7
2006-01-10 Perforation 236.30 237.30 7
2006-01-10 Perforation 232.00 233.00 7
2006-01-10 Perforation 222.60 223.90 7
2006-01-10 Perforation 216.70 220.40 7
2006-01-20 Fracture 216.70 327.20 0
2006-01-06 Perforation 595.00 600.00 14
2006-01-06 Perforation 585.00 590.00 14
2006-01-06 Perforation 580.00 582.00 14
2006-01-10 Packing Device Capped w/Cement 567.00 575.00 0
2006-01-10 Perforation 325.80 327.20 7
2006-01-10 Perforation 323.50 324.10 7
2006-01-10 Perforation 319.00 320.00 7

For data sources see[4]



References