X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434222307000

Well Details

Well ID: 0434222307000
Loading map...
Location: 00/07-23-043-22W4/0
Location Alias: 00/07-23-43-22 W4M
Location Alias 2: 00/07-23-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 23
County/Municipality: Ponoka County
Well Name: EMBER MALMO 7-23-43-22
Operator Name: Ember Resources Inc.
License Number: 0341098
License Date: 2005-10-27
License Status: Amended
Spud Date: 2005-11-20
Final Drill Date: 2005-11-21
Well Total Depth: 909.00 m
Surface Hole Latitude: 52.716194
Surface Hole Longitude: -113.076858

For data sources see[1][2]

Well History

Date Event
2005-10-27 Obtained License
2005-11-20 Direction Drilling Operation Performed - Deviate
2005-11-20 Surface Casing Operation Performed
2005-11-21 Finished Drilling
2005-11-21 Production Casing Operation Performed
2005-11-21 Rig Released
2005-11-21 Well Mode changed to Drilled and Cased
2005-11-24 Well Log Performed
2005-11-28 Perforation Treatment Performed - Jet Perforation
2006-01-16 Perforation Treatment Performed - Jet Perforation
2006-01-17 Perforation Treatment Performed - Fractured
2006-03-02 Well Began Production
2006-03-02 Well Fluid changed to Gas
2006-03-02 Well Mode changed to Flowing
2009-06-01 Well Fluid changed to Gas
2009-06-01 Well Mode changed to Suspended
2010-09-02 Well Fluid changed to Coalbed Methane-Coals and Other
2010-09-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-11-20 1.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-28 Perforation 565.00 566.40 14
2006-01-16 Perforation 421.20 422.00 7
2006-01-16 Perforation 414.50 415.60 7
2006-01-16 Perforation 398.30 398.80 7
2006-01-16 Perforation 393.40 393.90 7
2006-01-16 Perforation 379.00 379.80 7
2006-01-16 Perforation 376.80 377.20 7
2006-01-16 Perforation 364.10 365.00 7
2006-01-16 Perforation 362.00 363.00 7
2006-01-16 Perforation 360.00 360.40 7
2006-01-16 Perforation 340.10 340.60 7
2005-11-28 Perforation 554.00 556.00 14
2006-01-16 Perforation 334.60 335.70 7
2006-01-16 Perforation 333.00 333.50 7
2006-01-16 Perforation 330.50 331.00 7
2006-01-16 Perforation 324.50 326.00 7
2006-01-16 Perforation 323.10 323.40 7
2006-01-16 Perforation 316.80 317.20 7
2006-01-16 Perforation 315.50 316.00 7
2006-01-16 Perforation 307.00 307.80 7
2006-01-16 Perforation 302.60 303.40 7
2006-01-16 Perforation 301.00 301.50 7
2005-11-28 Perforation 531.60 534.00 14
2006-01-16 Perforation 296.50 297.20 7
2006-01-16 Perforation 295.00 295.50 7
2006-01-17 Fracture 492.00 566.40 0
2006-01-17 Fracture 295.00 440.70 0
2005-11-28 Perforation 522.50 526.00 14
2005-11-28 Perforation 498.50 500.20 14
2005-11-28 Perforation 492.00 495.00 14
2006-01-16 Perforation 439.80 440.70 7
2006-01-16 Perforation 434.50 435.50 7
2006-01-16 Perforation 431.70 432.10 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5085 0.0 0.0 0.0
2007 57 0.0 0.0 0.0
2010 2827 0.0 0.0 0.0
2011 8593 0.0 0.0 0.0
2012 8749 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8757 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8321 0.0 0.0 0.0
2018 6751 0.0 0.0 0.0
2019 7522 0.0 0.0 0.0
2020 2046 0.0 0.0 0.0

For data sources see[6]

References