X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434222806000

Well Details

Well ID: 0434222806000
Loading map...
Location: 00/06-28-043-22W4/0
Location Alias: 00/06-28-43-22 W4M
Location Alias 2: 00/06-28-043-22 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 28
County/Municipality: Ponoka County
Well Name: EMBER ET AL MALMO 6-28-43-22
Operator Name: Ember Resources Inc.
License Number: 0344560
License Date: 2005-12-07
License Status: Issued
Spud Date: 2006-03-03
Final Drill Date: 2006-03-04
Well Total Depth: 649.00 m
Surface Hole Latitude: 52.733832
Surface Hole Longitude: -113.140452

For data sources see[1][2]

Well History

Date Event
2005-12-07 Obtained License
2006-03-03 Surface Casing Operation Performed
2006-03-04 Finished Drilling
2006-03-04 Production Casing Operation Performed
2006-03-04 Rig Released
2006-03-04 Well Mode changed to Drilled and Cased
2006-03-07 Well Log Performed
2006-03-09 Perforation Treatment Performed - Jet Perforation
2006-03-14 Perforation Treatment Performed - Jet Perforation
2006-03-15 Perforation Treatment Performed - Fractured
2006-05-15 Well Began Production
2006-05-15 Well Fluid changed to Gas
2006-05-15 Well Mode changed to Flowing
2009-05-31 Well Fluid changed to Gas
2009-05-31 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-09 Perforation 551.60 553.00 14
2006-03-14 Perforation 299.10 301.00 7
2006-03-14 Perforation 284.40 285.00 7
2006-03-14 Perforation 277.70 278.50 7
2006-03-14 Perforation 276.20 277.00 7
2006-03-14 Perforation 268.00 271.10 7
2006-03-14 Perforation 253.10 254.20 7
2006-03-14 Perforation 249.20 250.00 7
2006-03-14 Perforation 233.30 235.60 7
2006-03-14 Perforation 227.40 227.90 7
2006-03-14 Perforation 219.90 220.50 7
2006-03-09 Perforation 544.50 546.20 14
2006-03-14 Perforation 209.00 211.00 7
2006-03-15 Fracture 353.00 553.00 0
2006-03-15 Fracture 209.00 321.20 0
2006-03-09 Perforation 410.70 412.50 14
2006-03-09 Perforation 405.00 407.70 14
2006-03-09 Perforation 392.80 396.00 14
2006-03-09 Perforation 353.00 355.00 14
2006-03-14 Perforation 320.70 321.20 7
2006-03-14 Perforation 317.60 319.10 7
2006-03-14 Perforation 306.70 307.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1 0.0 0.0 0.0
2009 3029 0.0 0.0 0.0
2010 8291 0.0 0.0 0.0
2011 8672 0.0 0.0 0.0
2012 8723 0.0 0.0 0.0
2013 8686 0.0 0.0 0.0
2014 7641 0.0 0.0 0.0
2015 7308 0.0 0.0 0.0
2016 7039 0.0 0.0 0.0
2017 3192 0.0 0.0 0.0
2018 5183 0.0 0.0 0.0
2019 2859 0.0 0.0 0.0

For data sources see[5]

References