If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434223001002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.728868,"lon":-113.176005,"icon":""}]} |
Location: 00/01-30-043-22W4/2 | |
Location Alias: 00/01-30-43-22 W4M | |
Location Alias 2: 00/01-30-043-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 30 | |
County/Municipality: Ponoka County | |
Well Name: EMBER MALMO 1-30-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0357635 | |
License Date: 2006-05-19 | |
License Status: Issued | |
Spud Date: 2006-06-28 | |
Final Drill Date: 2006-06-30 | |
Well Total Depth: 710.00 m | |
Surface Hole Latitude: 52.728868 | |
Surface Hole Longitude: -113.176005 |
Date | Event |
---|---|
2006-05-19 | Obtained License |
2006-06-29 | Surface Casing Operation Performed |
2006-06-30 | Finished Drilling |
2006-06-30 | Well Mode changed to Drilled and Cased |
2006-07-01 | Production Casing Operation Performed |
2006-07-01 | Rig Released |
2006-07-01 | Well Log Performed |
2006-11-17 | Perforation Treatment Performed - Jet Perforation |
2006-11-17 | Well Log Performed |
2006-12-08 | Perforation Treatment Performed - Jet Perforation |
2006-12-08 | Well Log Performed |
2006-12-09 | Perforation Treatment Performed - Fractured |
2007-03-06 | Well Began Production |
2007-03-06 | Well Fluid changed to Gas |
2007-03-06 | Well Mode changed to Flowing |
2009-03-01 | Perforation Treatment Performed - Jet Perforation |
2009-03-01 | Well Log Performed |
2009-03-08 | Perforation Treatment Performed - Fractured |
2009-03-12 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-11-17 | Perforation | 432.60 | 434.40 | 14 |
2006-12-08 | Perforation | 307.60 | 309.20 | 7 |
2006-12-08 | Perforation | 297.60 | 299.40 | 7 |
2006-12-08 | Perforation | 287.40 | 288.60 | 7 |
2006-12-08 | Perforation | 273.00 | 274.60 | 7 |
2006-12-08 | Perforation | 262.00 | 263.20 | 7 |
2006-12-08 | Perforation | 260.00 | 261.40 | 7 |
2006-12-08 | Perforation | 255.00 | 257.00 | 7 |
2006-12-08 | Perforation | 239.60 | 241.00 | 7 |
2006-12-08 | Perforation | 234.00 | 235.20 | 7 |
2006-12-09 | Fracture | 234.00 | 324.40 | 0 |
2006-11-17 | Perforation | 418.00 | 420.50 | 14 |
2009-03-01 | Perforation | 333.00 | 334.00 | 13 |
2009-03-01 | Perforation | 330.00 | 331.50 | 13 |
2009-03-01 | Perforation | 326.00 | 326.50 | 13 |
2009-03-01 | Perforation | 320.00 | 320.50 | 13 |
2009-03-01 | Perforation | 314.50 | 316.00 | 13 |
2009-03-01 | Perforation | 303.50 | 304.00 | 13 |
2009-03-01 | Perforation | 301.00 | 302.00 | 13 |
2009-03-01 | Perforation | 289.50 | 292.00 | 13 |
2009-03-01 | Perforation | 283.50 | 285.00 | 13 |
2009-03-01 | Perforation | 280.00 | 281.00 | 13 |
2006-11-17 | Perforation | 401.00 | 403.50 | 14 |
2009-03-01 | Perforation | 266.50 | 268.50 | 13 |
2009-03-01 | Perforation | 246.00 | 250.50 | 13 |
2009-03-01 | Perforation | 237.50 | 238.50 | 13 |
2009-03-01 | Perforation | 226.50 | 229.00 | 13 |
2009-03-08 | Fracture | 333.00 | 334.00 | 0 |
2009-03-08 | Fracture | 330.00 | 331.50 | 0 |
2009-03-08 | Fracture | 326.00 | 326.50 | 0 |
2009-03-08 | Fracture | 323.00 | 324.40 | 0 |
2009-03-08 | Fracture | 320.00 | 320.50 | 0 |
2009-03-08 | Fracture | 317.40 | 318.40 | 0 |
2006-11-17 | Perforation | 394.00 | 398.00 | 14 |
2009-03-08 | Fracture | 314.50 | 316.00 | 0 |
2009-03-08 | Fracture | 307.60 | 309.20 | 0 |
2009-03-08 | Fracture | 303.50 | 304.00 | 0 |
2009-03-08 | Fracture | 301.00 | 302.00 | 0 |
2009-03-08 | Fracture | 297.60 | 299.40 | 0 |
2009-03-08 | Fracture | 289.50 | 292.00 | 0 |
2009-03-08 | Fracture | 287.40 | 288.60 | 0 |
2009-03-08 | Fracture | 283.50 | 285.00 | 0 |
2009-03-08 | Fracture | 280.00 | 281.00 | 0 |
2009-03-08 | Fracture | 273.00 | 274.60 | 0 |
2006-11-17 | Perforation | 385.00 | 388.00 | 14 |
2009-03-08 | Fracture | 266.50 | 268.50 | 0 |
2009-03-08 | Fracture | 262.00 | 263.20 | 0 |
2009-03-08 | Fracture | 260.00 | 261.40 | 0 |
2009-03-08 | Fracture | 255.00 | 257.00 | 0 |
2009-03-08 | Fracture | 246.00 | 250.50 | 0 |
2009-03-08 | Fracture | 239.60 | 241.00 | 0 |
2009-03-08 | Fracture | 237.50 | 238.50 | 0 |
2009-03-08 | Fracture | 234.00 | 235.20 | 0 |
2009-03-08 | Fracture | 226.50 | 229.00 | 0 |
2006-11-17 | Perforation | 378.00 | 380.50 | 14 |
2006-11-17 | Perforation | 372.00 | 374.50 | 14 |
2006-12-08 | Perforation | 323.00 | 324.40 | 7 |
2006-12-08 | Perforation | 317.40 | 318.40 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 6376 | 0.0 | 0.0 | 0.0 |
2008 | 2382 | 0.0 | 0.0 | 0.0 |
For data sources see[5]