X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434223106002

Well Details

Well ID: 0434223106002
Loading map...
Location: 00/06-31-043-22W4/2
Location Alias: 00/06-31-43-22 W4M
Location Alias 2: 00/06-31-043-22 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 22
Section: 31
County/Municipality: Ponoka County
Well Name: EMBER MALMO 6-31-43-22
Operator Name: Ember Resources Inc.
License Number: 0325784
License Date: 2005-02-07
License Status: Issued
Spud Date: 2005-02-09
Final Drill Date: 2005-02-19
Well Total Depth: 528.00 m
Surface Hole Latitude: 52.746265
Surface Hole Longitude: -113.188462

For data sources see[1][2]

Well History

Date Event
2005-02-07 Obtained License
2005-02-09 Surface Casing Operation Performed
2005-02-19 Finished Drilling
2005-02-19 Production Casing Operation Performed
2005-02-19 Rig Released
2005-02-19 Well Mode changed to Drilled and Cased
2005-02-24 Well Log Performed
2005-02-28 Perforation Treatment Performed - Jet Perforation
2005-02-28 Well Log Performed
2005-03-15 Perforation Treatment Performed - Jet Perforation
2005-03-15 Well Log Performed
2005-12-15 Perforation Treatment Performed - Fractured
2005-12-20 Well Began Production
2005-12-20 Well Fluid changed to Coalbed Methane-Coals Only
2005-12-20 Well Mode changed to Flowing
2009-05-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-28 Perforation 364.00 366.00 14
2005-02-28 Perforation 475.50 478.00 14
2005-03-15 Perforation 218.00 218.70 7
2005-03-15 Perforation 221.20 222.00 7
2005-03-15 Perforation 226.10 226.70 7
2005-03-15 Perforation 227.30 228.20 7
2005-03-15 Perforation 236.20 236.60 7
2005-03-15 Perforation 244.50 244.90 7
2005-03-15 Perforation 246.30 247.00 7
2005-03-15 Perforation 248.60 249.00 7
2005-03-15 Perforation 250.70 251.40 7
2005-02-28 Perforation 367.50 368.50 14
2005-03-15 Perforation 258.70 260.40 7
2005-03-15 Perforation 262.30 263.00 7
2005-03-15 Perforation 273.20 273.60 7
2005-03-15 Perforation 275.40 277.00 7
2005-03-15 Perforation 279.00 280.00 7
2005-03-15 Perforation 283.80 284.40 7
2005-03-15 Perforation 285.00 285.60 7
2005-03-15 Perforation 286.10 287.00 7
2005-03-15 Perforation 296.80 297.20 7
2005-03-15 Perforation 307.90 308.40 7
2005-02-28 Perforation 374.00 377.00 14
2005-03-15 Perforation 309.60 310.00 7
2005-03-15 Perforation 315.40 316.00 7
2005-03-15 Perforation 320.40 321.10 7
2005-03-15 Perforation 325.00 325.60 7
2005-03-15 Perforation 332.70 333.50 7
2005-12-15 Fracture 218.00 333.50 0
2005-02-28 Perforation 406.50 407.50 14
2005-02-28 Perforation 411.50 413.00 14
2005-02-28 Perforation 417.00 419.00 14
2005-02-28 Perforation 420.00 421.00 14
2005-02-28 Perforation 423.50 424.50 14
2005-02-28 Perforation 450.00 451.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 276 0.0 0.0 0.0
2006 8657 0.0 0.0 0.0
2007 8686 0.0 0.0 0.0
2008 8670 0.0 0.0 0.0
2009 3457 0.0 0.0 0.0

For data sources see[5]

References