If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434223203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.744269,"lon":-113.166066,"icon":""}]} |
Location: 00/03-32-043-22W4/0 | |
Location Alias: 00/03-32-43-22 W4M | |
Location Alias 2: 00/03-32-043-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 32 | |
County/Municipality: Ponoka County | |
Well Name: EMBER MALMO 3-32-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411298 | |
License Date: 2009-07-07 | |
License Status: Issued | |
Spud Date: 2009-07-22 | |
Final Drill Date: 2009-07-24 | |
Well Total Depth: 673.10 m | |
Surface Hole Latitude: 52.744269 | |
Surface Hole Longitude: -113.166066 |
Date | Event |
---|---|
2009-07-07 | Obtained License |
2009-07-23 | Surface Casing Operation Performed |
2009-07-24 | Finished Drilling |
2009-07-24 | Production Casing Operation Performed |
2009-07-24 | Rig Released |
2009-07-24 | Well Mode changed to Drilled and Cased |
2009-08-02 | Well Log Performed |
2009-08-19 | Perforation Treatment Performed - Jet Perforation |
2009-08-20 | Perforation Treatment Performed - Jet Perforation |
2009-08-21 | Perforation Treatment Performed - Fractured |
2009-08-27 | Well Began Production |
2009-08-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-08-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-08-19 | Perforation | 333.00 | 334.00 | 13 |
2009-08-20 | Perforation | 258.00 | 259.50 | 13 |
2009-08-20 | Perforation | 230.00 | 231.50 | 13 |
2009-08-20 | Perforation | 224.80 | 225.80 | 13 |
2009-08-20 | Perforation | 220.00 | 221.00 | 13 |
2009-08-20 | Perforation | 541.00 | 542.00 | 17 |
2009-08-20 | Perforation | 427.00 | 429.00 | 17 |
2009-08-20 | Perforation | 414.00 | 415.00 | 17 |
2009-08-20 | Perforation | 406.50 | 407.50 | 17 |
2009-08-20 | Perforation | 401.50 | 402.50 | 17 |
2009-08-20 | Perforation | 383.00 | 384.00 | 17 |
2009-08-19 | Perforation | 328.50 | 330.00 | 13 |
2009-08-20 | Perforation | 372.00 | 374.00 | 17 |
2009-08-20 | Perforation | 367.00 | 368.00 | 17 |
2009-08-20 | Perforation | 350.50 | 351.50 | 17 |
2009-08-21 | Fracture | 333.00 | 334.00 | 0 |
2009-08-21 | Fracture | 328.50 | 330.00 | 0 |
2009-08-21 | Fracture | 323.50 | 324.50 | 0 |
2009-08-21 | Fracture | 318.00 | 319.00 | 0 |
2009-08-21 | Fracture | 311.00 | 311.50 | 0 |
2009-08-21 | Fracture | 296.50 | 297.50 | 0 |
2009-08-21 | Fracture | 286.60 | 287.10 | 0 |
2009-08-19 | Perforation | 323.50 | 324.50 | 13 |
2009-08-21 | Fracture | 276.50 | 280.00 | 0 |
2009-08-21 | Fracture | 261.00 | 262.00 | 0 |
2009-08-21 | Fracture | 258.00 | 259.50 | 0 |
2009-08-21 | Fracture | 230.00 | 231.50 | 0 |
2009-08-21 | Fracture | 224.80 | 225.80 | 0 |
2009-08-21 | Fracture | 220.00 | 221.00 | 0 |
2009-08-19 | Perforation | 318.00 | 319.00 | 13 |
2009-08-19 | Perforation | 311.00 | 311.50 | 13 |
2009-08-19 | Perforation | 296.50 | 297.50 | 13 |
2009-08-19 | Perforation | 286.60 | 287.10 | 13 |
2009-08-19 | Perforation | 276.50 | 280.00 | 13 |
2009-08-20 | Perforation | 261.00 | 262.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 2781 | 0.0 | 0.0 | 0.0 |
2010 | 8368 | 0.0 | 0.0 | 0.0 |
2011 | 8564 | 0.0 | 0.0 | 0.0 |
2012 | 8029 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8588 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8320 | 0.0 | 0.0 | 0.0 |
2017 | 8441 | 0.0 | 0.0 | 0.0 |
2018 | 8515 | 0.0 | 0.0 | 0.0 |
2019 | 6268 | 0.0 | 0.0 | 0.0 |
2020 | 225 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-11-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]