X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434230609030

Well Details

Well ID: 0434230609030
Loading map...
Location: 03/09-06-043-23W4/0
Location Alias: 03/09-06-43-23 W4M
Location Alias 2: 03/09-06-043-23 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 23
Section: 06
County/Municipality: Ponoka County
Well Name: BASHAW OIL CO WOODRIV 9-6-43-23
Operator Name: Clearview Resources Ltd.
License Number: 0175966
License Date: 1995-02-09
License Status: Suspension
Spud Date: 1995-03-05
Final Drill Date: 1995-03-16
Well Total Depth: 1805.00 m
Surface Hole Latitude: 52.679535
Surface Hole Longitude: -113.323724

For data sources see[1][2]

Well History

Date Event
1995-02-09 Obtained License
1995-03-06 Surface Casing Operation Performed
1995-03-16 Finished Drilling
1995-03-16 Lost Circulation Occurred
1995-03-16 Well Log Performed
1995-03-16 Well Mode changed to Drilled and Cased
1995-03-20 Perforation Treatment Performed - Jet Perforation
1995-03-22 Perforation Treatment Performed - Remedial Casing
1995-03-23 Perforation Treatment Performed - Remedial Casing
1995-03-23 Production Casing Operation Performed
1995-03-23 Rig Released
1995-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-07 Perforation Treatment Performed - Jet Perforation
1995-07-09 Perforation Treatment Performed - Remedial Casing
1995-07-12 Perforation Treatment Performed - Jet Perforation
1995-07-12 Well Log Performed
1995-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-02 Well Began Injection
1995-09-02 Well Fluid changed to Water
1995-09-02 Well Type changed to Disposal
2017-04-01 Well Fluid changed to Water
2017-04-01 Well Mode changed to Suspended
2017-04-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-20 Perforation 1784.20 1784.70 8
1995-03-20 Perforation 1201.00 1202.00 8
1995-03-22 Remedial Casing Cementing 1784.20 1784.70 0
1995-03-23 Remedial Casing Cementing 1201.00 1202.00 0
1995-07-07 Perforation 1201.00 1202.00 8
1995-07-07 Acid Treatment 1201.00 1202.00 0
1995-07-09 Remedial Casing Cementing 1201.00 1202.00 0
1995-07-12 Perforation 1790.00 1802.00 13
1995-07-13 Acid Treatment 1790.00 1802.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-03-16 Lost Circulation 1805.00 1805.00

For data sources see[6]

References