X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434260203000

Well Details

Well ID: 0434260203000
Loading map...
Location: 00/03-02-043-26W4/0
Location Alias: 00/03-02-43-26 W4M
Location Alias 2: 00/03-02-043-26 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 26
Section: 02
County/Municipality: Ponoka County
Well Name: ABE CHIGWELL 3-2-43-26
Operator Name: AlphaBow Energy Ltd.
License Number: 0495145
License Date: 2019-07-17
License Status: Amended
Spud Date: 2019-10-12
Final Drill Date: 2019-10-20
Well Total Depth: 3166.00 m
Surface Hole Latitude: 52.656421
Surface Hole Longitude: -113.655189

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-10-16 1012.90 Deviate (5 - 79 degrees)
2019-10-16 1559.50 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-01 Multi-Stage Fracture 3129.50 3129.60 0
2019-11-02 Multi-Stage Fracture 2733.30 2733.40 0
2019-11-02 Multi-Stage Fracture 2694.40 2694.50 0
2019-11-02 Multi-Stage Fracture 2644.60 2644.70 0
2019-11-02 Multi-Stage Fracture 2605.40 2605.50 0
2019-11-02 Multi-Stage Fracture 2555.40 2555.50 0
2019-11-02 Multi-Stage Fracture 2516.60 2516.70 0
2019-11-02 Multi-Stage Fracture 2466.10 2466.20 0
2019-11-02 Multi-Stage Fracture 2377.00 2377.10 0
2019-11-02 Multi-Stage Fracture 2337.90 2338.00 0
2019-11-02 Multi-Stage Fracture 2287.60 2287.70 0
2019-11-01 Multi-Stage Fracture 3091.00 3091.10 0
2019-11-02 Multi-Stage Fracture 2248.80 2248.90 0
2019-11-02 Multi-Stage Fracture 2198.50 2198.60 0
2019-11-02 Multi-Stage Fracture 2159.60 2159.70 0
2019-11-02 Multi-Stage Fracture 2109.10 2109.20 0
2019-11-02 Multi-Stage Fracture 2070.10 2070.20 0
2019-11-02 Multi-Stage Fracture 2019.70 2019.80 0
2019-11-02 Multi-Stage Fracture 1981.10 1981.20 0
2019-11-02 Multi-Stage Fracture 1930.60 1930.70 0
2019-11-02 Multi-Stage Fracture 1880.50 1880.60 0
2019-11-02 Multi-Stage Fracture 1830.10 1830.20 0
2019-11-01 Multi-Stage Fracture 3051.80 3051.90 0
2019-11-02 Multi-Stage Fracture 1779.50 1779.60 0
2019-11-02 Multi-Stage Fracture 1729.30 1729.40 0
2019-11-02 Multi-Stage Fracture 1679.10 1679.20 0
2019-11-02 Multi-Stage Fracture 1629.10 1629.20 0
2019-11-02 Multi-Stage Fracture 2427.30 2427.40 0
2019-11-02 Multi-Stage Fracture 3001.40 3001.50 0
2019-11-02 Multi-Stage Fracture 2962.00 2962.10 0
2019-11-02 Multi-Stage Fracture 2911.70 2911.80 0
2019-11-02 Multi-Stage Fracture 2873.00 2873.10 0
2019-11-02 Multi-Stage Fracture 2822.80 2822.90 0
2019-11-02 Multi-Stage Fracture 2783.80 2783.90 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-01 2019-11-02 1,374 2,269 N/A
2 2019-11-02 2019-11-02 1,374 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 86.2816 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.0119 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0458 N/A
water 7732-18-5 100 0.0458 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.031 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.0824 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1331 N/A
Ethylene glycol 107-21-1 100 0.1331 N/A
Potassium Carbonate 584-08-7 100 0.1331 N/A
Potassium Hydroxide 1310-58-3 100 0.1331 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3372 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0607 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0607 N/A
water 7732-18-5 100 0.0607 N/A
2 Iron Horse Spearhead Acid Package Fusion Technologies Inc. Acid Hydrogen Chloride 7647-01-0 100 0.5397 N/A
water Not Available 100 0.5397 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1192 0.0 0.0 0.0
2020 2084 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-12 No Incident Encountered 0.00 0.00
2019-11-01 No Incident Encountered 0.00 0.00
2019-11-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References