X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434270514020

Well Details

Well ID: 0434270514020
Loading map...
Location: 02/14-05-043-27W4/0
Location Alias: 02/14-05-43-27 W4M
Location Alias 2: 02/14-05-043-27 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 27
Section: 05
County/Municipality: Ponoka County
Well Name: BEC HZ MORNSIDE 14-5-43-27
Operator Name: Bonavista Energy Corporation
License Number: 0483270
License Date: 2017-03-22
License Status: Issued
Spud Date: 2017-04-01
Final Drill Date: 2017-04-09
Well Total Depth: 5227.00 m
Surface Hole Latitude: 52.651377
Surface Hole Longitude: -113.884250

For data sources see[1][2]

Well History

Date Event
2017-03-22 Obtained License
2017-04-01 Surface Casing Operation Performed
2017-04-03 Direction Drilling Operation Performed - Deviate
2017-04-04 Direction Drilling Operation Performed - Horizontal
2017-04-04 Well Log Performed
2017-04-05 Intermediate Casing Operation Performed
2017-04-09 Finished Drilling
2017-04-09 Well Log Performed
2017-04-09 Well Mode changed to Drilled and Cased
2017-04-11 Liner Casing Operation Performed
2017-04-12 Perforation Treatment Performed - Open-Hole Completion
2017-04-12 Rig Released
2017-05-04 Well Log Performed
2017-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-14 Well Fluid changed to Gas
2017-05-14 Well Mode changed to Testing
2017-05-19 Well Began Production
2017-05-19 Well Fluid changed to Gas
2017-05-19 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-04-01 Savanna Drilling Corp. 631 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-04-03 1351.00 Deviate (5 - 79 degrees)
2017-04-04 1871.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-12 Open Hole/Barefoot Completion 5216.00 5227.00 0
2017-05-08 Multi-Stage Fracture 4276.40 4276.50 0
2017-05-08 Multi-Stage Fracture 4154.70 4154.80 0
2017-05-08 Multi-Stage Fracture 4046.20 4046.30 0
2017-05-08 Multi-Stage Fracture 3924.50 3924.60 0
2017-05-08 Multi-Stage Fracture 3803.00 3803.10 0
2017-05-08 Multi-Stage Fracture 3680.60 3680.70 0
2017-05-08 Multi-Stage Fracture 3571.40 3571.50 0
2017-05-08 Multi-Stage Fracture 3448.80 3448.90 0
2017-05-08 Multi-Stage Fracture 3339.30 3339.40 0
2017-05-08 Multi-Stage Fracture 3218.30 3218.40 0
2017-05-08 Multi-Stage Fracture 5190.60 5190.70 0
2017-05-09 Multi-Stage Fracture 3096.90 3097.00 0
2017-05-09 Multi-Stage Fracture 2974.60 2974.70 0
2017-05-09 Multi-Stage Fracture 2865.90 2866.00 0
2017-05-09 Multi-Stage Fracture 2743.10 2743.20 0
2017-05-09 Multi-Stage Fracture 2620.70 2620.80 0
2017-05-09 Multi-Stage Fracture 2514.20 2514.30 0
2017-05-09 Multi-Stage Fracture 2392.60 2392.70 0
2017-05-09 Multi-Stage Fracture 2271.50 2271.60 0
2017-05-09 Multi-Stage Fracture 2149.20 2149.30 0
2017-05-09 Multi-Stage Fracture 2040.30 2040.40 0
2017-05-08 Multi-Stage Fracture 5102.40 5102.50 0
2017-05-08 Multi-Stage Fracture 4979.40 4979.50 0
2017-05-08 Multi-Stage Fracture 4859.70 4859.80 0
2017-05-08 Multi-Stage Fracture 4751.60 4751.70 0
2017-05-08 Multi-Stage Fracture 4630.80 4630.90 0
2017-05-08 Multi-Stage Fracture 4508.20 4508.30 0
2017-05-08 Multi-Stage Fracture 4398.90 4399.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-08 2017-05-09 1,643 1,497 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 50.9073 N/A
Water 7732-18-5 100 24.6247 N/A
20/40 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 23.7916 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0027 N/A
Methyl Alcohol 67-56-1 100 0.0027 N/A
Non-Hazardous Ingredients Not Available 100 0.0027 N/A
SVB-1 (Viscoelastic Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0514 N/A
SBL-2 (Buffer) Step Energy Services Buffer Acetic Acid 64-19-7 100 0.0514 N/A
Non-Hazardous Ingredients Not Available 100 0.0514 N/A
SVS-1 (Viscoelastic Surfactant) Step Energy Services Surfactant Proprietary Not Available 100 0.5705 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-05 2017-05-07 Surface Water - Runoff 1313

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5394 0.0 0.0 0.0
2018 8746 0.0 0.0 0.0
2019 8032 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-04-09 No Incident Encountered 0.00 0.00
2017-05-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References