X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435041713002

Well Details

Well ID: 0435041713002
Loading map...
Location: 00/13-17-043-04W5/2
Location Alias: 00/13-17-43-04 W5M
Location Alias 2: 00/13-17-043-04 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 17
County/Municipality: Ponoka County
Well Name: ECA HZ WILSONCK 13-17-43-4
Operator Name: Ovintiv Canada ULC
License Number: 0437484
License Date: 2011-10-06
License Status: Amended
Spud Date: 2011-12-07
Final Drill Date: 2012-01-16
Well Total Depth: 4236.00 m
Surface Hole Latitude: 52.701043
Surface Hole Longitude: -114.541859

For data sources see[1][2]

Well History

Date Event
2011-10-06 Obtained License
2011-12-09 Surface Casing Operation Performed
2011-12-19 Intermediate Casing Operation Performed
2011-12-22 Direction Drilling Operation Performed - Horizontal
2012-01-16 Finished Drilling
2012-01-16 Perforation Treatment Performed - Open-Hole Completion
2012-01-16 Well Mode changed to Drilled and Cased
2012-01-18 Well Log Performed
2012-01-19 Production Casing Operation Performed
2012-01-19 Well Log Performed
2012-01-22 Liner Casing Operation Performed
2012-01-26 Well Log Performed
2012-02-22 Rig Released
2012-02-29 Perforation Treatment Performed - Jet Perforation
2012-03-08 Perforation Treatment Performed - Jet Perforation
2012-03-11 Perforation Treatment Performed - Fractured
2012-03-12 Perforation Treatment Performed - Jet Perforation
2012-03-13 Perforation Treatment Performed - Fractured
2012-03-13 Perforation Treatment Performed - Jet Perforation
2012-03-16 Perforation Treatment Performed - Fractured
2012-03-16 Perforation Treatment Performed - Jet Perforation
2012-03-17 Perforation Treatment Performed - Jet Perforation
2012-03-18 Perforation Treatment Performed - Fractured
2012-03-20 Perforation Treatment Performed - Jet Perforation
2012-03-21 Perforation Treatment Performed - Fractured
2012-03-21 Perforation Treatment Performed - Jet Perforation
2012-03-22 Perforation Treatment Performed - Fractured
2012-03-22 Perforation Treatment Performed - Jet Perforation
2012-03-23 Perforation Treatment Performed - Fractured
2012-03-23 Perforation Treatment Performed - Jet Perforation
2012-03-25 Perforation Treatment Performed - Fractured
2012-03-25 Perforation Treatment Performed - Jet Perforation
2012-03-26 Perforation Treatment Performed - Fractured
2012-03-26 Perforation Treatment Performed - Jet Perforation
2012-03-27 Perforation Treatment Performed - Fractured
2012-04-11 Well Fluid changed to Shale Gas Only
2012-04-11 Well Mode changed to Testing
2012-06-18 Well Began Production
2012-06-18 Well Fluid changed to Shale Gas Only
2012-06-18 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-22 2600.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-16 Open Hole/Barefoot Completion 4229.00 4236.00 0
2012-03-13 Perforation 3967.00 3968.50 20
2012-03-13 Perforation 3943.00 3944.50 20
2012-03-13 Perforation 3917.00 3918.50 20
2012-03-13 Fracture 3917.00 3968.50 0
2012-03-16 Perforation 3858.00 3859.50 20
2012-03-16 Perforation 3826.00 3827.50 20
2012-03-16 Perforation 3794.00 3795.50 20
2012-03-16 Fracture 3794.00 3859.50 0
2012-03-16 Perforation 3735.00 3736.50 20
2012-03-16 Perforation 3710.00 3711.50 20
2012-02-29 Perforation 4179.00 4182.00 20
2012-03-16 Perforation 3685.00 3686.50 20
2012-03-16 Fracture 3685.00 3736.50 0
2012-03-17 Perforation 3640.00 3641.50 20
2012-03-17 Perforation 3620.00 3621.50 20
2012-03-17 Perforation 3600.00 3601.50 20
2012-03-18 Fracture 3600.00 3641.50 0
2012-03-20 Perforation 3555.00 3556.50 20
2012-03-20 Perforation 3530.00 3531.50 20
2012-03-20 Perforation 3505.00 3506.50 20
2012-03-21 Fracture 3505.00 3556.50 0
2012-03-08 Perforation 4151.00 4152.50 20
2012-03-21 Perforation 3453.00 3454.50 20
2012-03-21 Perforation 3426.00 3427.50 20
2012-03-21 Perforation 3399.00 3400.50 20
2012-03-22 Fracture 3399.00 3454.50 0
2012-03-22 Perforation 3345.00 3346.50 20
2012-03-22 Perforation 3320.00 3321.50 20
2012-03-22 Perforation 3295.00 3296.50 20
2012-03-23 Fracture 3295.00 3346.50 0
2012-03-23 Perforation 3245.00 3246.50 20
2012-03-23 Perforation 3220.00 3221.50 20
2012-03-08 Perforation 4123.00 4124.50 20
2012-03-23 Perforation 3195.00 3196.50 20
2012-03-23 Fracture 3195.00 3246.50 0
2012-03-25 Perforation 3148.00 3148.50 20
2012-03-25 Perforation 3122.00 3123.50 20
2012-03-25 Perforation 3104.00 3105.50 20
2012-03-25 Fracture 3104.00 3148.50 0
2012-03-25 Perforation 3055.00 3056.50 20
2012-03-25 Perforation 3030.00 3031.50 20
2012-03-25 Perforation 3005.00 3006.50 20
2012-03-26 Fracture 3005.00 3056.50 0
2012-03-11 Fracture 4123.00 4182.00 0
2012-03-26 Perforation 2965.00 2966.50 20
2012-03-26 Perforation 2950.00 2951.50 20
2012-03-26 Perforation 2935.00 2936.50 20
2012-03-27 Fracture 2935.00 2966.50 0
2012-03-12 Perforation 4072.00 4073.50 20
2012-03-12 Perforation 4046.00 4047.50 20
2012-03-12 Perforation 4020.00 4021.50 20
2012-03-13 Fracture 4020.00 4073.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4720 0.0 0.0 0.0
2013 8479 0.0 0.0 0.0
2014 5004 0.0 0.0 0.0
2015 4951 0.0 0.0 0.0
2016 7611 0.0 0.0 0.0
2017 8518 0.0 0.0 0.0
2018 8429 0.0 0.0 0.0
2019 6290 0.0 0.0 0.0
2020 1911 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-23 No Incident Encountered 0.00 0.00
2012-04-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References