If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435092802000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.742381,"lon":-115.242897,"icon":""}]} |
Location: 00/02-28-043-09W5/0 | |
Location Alias: 00/02-28-43-09 W5M | |
Location Alias 2: 00/02-28-043-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 28 | |
County/Municipality: Clearwater County | |
Well Name: VEI HZ WILLGR 2-28-43-9 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0496067 | |
License Date: 2019-10-11 | |
License Status: Issued | |
Spud Date: 2020-02-09 | |
Final Drill Date: 2020-02-17 | |
Well Total Depth: 3865.00 m | |
Surface Hole Latitude: 52.742381 | |
Surface Hole Longitude: -115.242897 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2020-02-09 | Ironhand Drilling Inc. | 5 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2020-02-15 | 2062.60 | Deviate (5 - 79 degrees) |
2020-02-16 | 2562.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-03-01 | Open Hole/Barefoot Completion | 3840.00 | 3865.00 | 0 |
2020-03-02 | Multi-Stage Fracture | 3180.00 | 3180.10 | 0 |
2020-03-02 | Multi-Stage Fracture | 3096.40 | 3096.50 | 0 |
2020-03-02 | Multi-Stage Fracture | 3027.20 | 3027.30 | 0 |
2020-03-02 | Multi-Stage Fracture | 2944.50 | 2944.60 | 0 |
2020-03-02 | Multi-Stage Fracture | 2860.90 | 2861.00 | 0 |
2020-03-02 | Multi-Stage Fracture | 2777.40 | 2777.50 | 0 |
2020-03-02 | Multi-Stage Fracture | 2707.60 | 2707.70 | 0 |
2020-03-02 | Multi-Stage Fracture | 2624.30 | 2624.40 | 0 |
2020-03-02 | Multi-Stage Fracture | 3801.50 | 3801.60 | 0 |
2020-03-02 | Multi-Stage Fracture | 3745.00 | 3745.10 | 0 |
2020-03-02 | Multi-Stage Fracture | 3664.00 | 3664.10 | 0 |
2020-03-02 | Multi-Stage Fracture | 3580.80 | 3580.90 | 0 |
2020-03-02 | Multi-Stage Fracture | 3496.70 | 3496.80 | 0 |
2020-03-02 | Multi-Stage Fracture | 3426.70 | 3426.80 | 0 |
2020-03-02 | Multi-Stage Fracture | 3343.00 | 3343.10 | 0 |
2020-03-02 | Multi-Stage Fracture | 3263.00 | 3263.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 331 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-02-21 | No Incident Encountered | 0.00 | 0.00 |
2020-03-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]