X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435100904000

Well Details

Well ID: 0435100904000
Loading map...
Location: 00/04-09-043-10W5/0
Location Alias: 00/04-09-43-10 W5M
Location Alias 2: 00/04-09-043-10 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 10
Section: 09
County/Municipality: Clearwater County
Well Name: VEI HZ FERRIER 4-9-43-10
Operator Name: Vermilion Energy Inc.
License Number: 0474295
License Date: 2015-01-19
License Status: Issued
Spud Date: 2015-02-22
Final Drill Date: 2015-03-06
Well Total Depth: 4033.00 m
Surface Hole Latitude: 52.698679
Surface Hole Longitude: -115.402572

For data sources see[1][2]

Well History

Date Event
2015-01-19 Obtained License
2015-02-23 Surface Casing Operation Performed
2015-02-26 Intermediate Casing Operation Performed
2015-02-27 Direction Drilling Operation Performed - Deviate
2015-03-03 Direction Drilling Operation Performed - Horizontal
2015-03-06 Finished Drilling
2015-03-06 Well Log Performed
2015-03-06 Well Mode changed to Drilled and Cased
2015-03-07 Perforation Treatment Performed - Open-Hole Completion
2015-03-07 Production Casing Operation Performed
2015-03-08 Rig Released
2015-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-15 Well Began Production
2016-01-15 Well Fluid changed to Gas
2016-01-15 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-22 Nabors Drilling Limited 11 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-27 2299.60 Deviate (5 - 79 degrees)
2015-03-03 2739.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-07 Open Hole/Barefoot Completion 4025.00 4033.00 0
2015-03-17 Multi-Stage Fracture 3396.70 3477.30 0
2015-03-17 Multi-Stage Fracture 3328.80 3396.70 0
2015-03-17 Multi-Stage Fracture 3261.10 3328.80 0
2015-03-17 Multi-Stage Fracture 3180.50 3261.10 0
2015-03-17 Multi-Stage Fracture 3113.20 3180.50 0
2015-03-17 Multi-Stage Fracture 3032.70 3113.20 0
2015-03-18 Multi-Stage Fracture 2965.30 3032.70 0
2015-03-18 Multi-Stage Fracture 2884.80 2965.30 0
2015-03-18 Multi-Stage Fracture 2816.80 2884.80 0
2015-03-17 Multi-Stage Fracture 3994.20 4023.40 0
2015-03-17 Multi-Stage Fracture 3913.60 3994.20 0
2015-03-17 Multi-Stage Fracture 3846.30 3913.60 0
2015-03-17 Multi-Stage Fracture 3764.40 3846.30 0
2015-03-17 Multi-Stage Fracture 3695.50 3764.40 0
2015-03-17 Multi-Stage Fracture 3627.40 3695.50 0
2015-03-17 Multi-Stage Fracture 3545.30 3627.40 0
2015-03-17 Multi-Stage Fracture 3477.30 3545.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-17 2015-03-18 2,603 2,125 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.4185 N/A
water Not Available 100 80.6234 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 5.9264 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.2309 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 2.5545 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.01 N/A
dibromoacetonitrile 3252-43-5 100 0.01 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
polyethylene glycol 25322-68-3 100 0.01 N/A
sodium bromide 7647-15-6 100 0.01 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1507 N/A
non-hazardous ingredients Not Available 100 0.1507 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.085 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.085 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.085 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-12 2015-03-18 Surface Water - Runoff 2168

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 6960 0.0 0.0 0.0
2017 8097 0.0 0.0 0.0
2018 8025 0.0 0.0 0.0
2019 8511 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-07 No Incident Encountered 0.00 0.00
2015-03-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References