X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435112311004

Well Details

Well ID: 0435112311004
Loading map...
Location: 00/11-23-043-11W5/4
Location Alias: 00/11-23-43-11 W5M
Location Alias 2: 00/11-23-043-11 W5/04
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 11
Section: 23
County/Municipality: Clearwater County
Well Name: VERMILION SUNCHILD 11-23-43-11
Operator Name: Vermilion Energy Inc.
License Number: 0116407
License Date: 1985-07-24
License Status: Issued
Spud Date: 1985-07-31
Final Drill Date: 1985-09-21
Well Total Depth: 3000.00 m
Surface Hole Latitude: 52.723109
Surface Hole Longitude: -115.493168

For data sources see[1][2]

Well History

Date Event
1985-07-24 Obtained License
1985-08-04 Surface Casing Operation Performed
1985-08-08 Lost Circulation Occurred
1985-08-25 Kick Occurred
1985-09-10 Well Log Performed
1985-09-17 Drill Stem Test Performed
1985-09-21 Finished Drilling
1985-09-21 Well Mode changed to Drilled and Cased
1985-09-23 Lost Circulation Occurred
1985-09-25 Production Casing Operation Performed
1985-09-26 Rig Released
1985-11-04 Perforation Treatment Performed - Open-Hole Completion
1985-11-08 Liner Casing Operation Performed
1985-11-08 Perforation Treatment Performed - Cement Squeeze
1985-11-13 Well Log Performed
1985-11-15 Perforation Treatment Performed - Jet Perforation
1985-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-30 Perforation Treatment Performed - Jet Perforation
1985-11-30 Well Log Performed
1985-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-13 Perforation Treatment Performed - Jet Perforation
1985-12-13 Well Log Performed
1985-12-14 Perforation Treatment Performed - Fractured
1986-01-10 Well Log Performed
1986-01-12 Perforation Treatment Performed - Cement Squeeze
1986-09-21 Well Log Performed
1988-08-05 Perforation Treatment Performed - Jet Perforation
1988-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-19 Well Log Performed
1995-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-16 Well Log Performed
1996-02-14 Well Log Performed
1996-09-19 Perforation Treatment Performed - Jet Perforation
1996-09-20 Well Log Performed
2003-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-09 Well Log Performed
2004-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-10 Plug Back Performed
2004-06-13 Perforation Treatment Performed - Jet Perforation
2004-07-16 Well Log Performed
2004-07-20 Well Log Performed
2004-08-20 Well Log Performed
2004-08-28 Well Log Performed
2004-08-30 Well Log Performed
2004-09-16 Perforation Treatment Performed - Cement Plug
2004-09-16 Plug Back Performed
2004-09-17 Well Log Performed
2004-10-30 Perforation Treatment Performed - Fractured
2005-09-24 Perforation Treatment Performed - Jet Perforation
2005-09-24 Well Log Performed
2005-09-27 Perforation Treatment Performed - Fractured
2005-10-03 Perforation Treatment Performed - Jet Perforation
2005-10-03 Well Log Performed
2005-10-07 Perforation Treatment Performed - Fractured
2005-12-09 Well Began Production
2005-12-09 Well Fluid changed to Gas
2005-12-09 Well Mode changed to Flowing
2006-03-28 Well Fluid changed to Gas
2006-03-28 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-04 Open Hole/Barefoot Completion 2932.00 3000.00 0
1986-01-12 Cement Squeeze 2635.50 2636.50 0
1988-08-05 Perforation 2955.50 2958.30 13
1988-08-05 Perforation 2980.30 2983.30 13
1988-08-06 Acid Treatment 2980.30 2983.30 0
1988-08-06 Acid Treatment 2955.50 2961.50 0
1988-08-13 Acid Treatment 2980.30 2983.30 0
1995-10-15 Packing Device Capped w/Cement 2965.00 2969.00 0
1996-09-19 Perforation 2635.50 2636.50 13
2003-02-11 Acid Treatment 2955.50 2961.50 0
2004-06-10 Packing Device Capped w/Cement 2939.00 2947.00 0
1985-11-08 Cement Squeeze 2932.00 3000.00 0
2004-06-13 Perforation 2851.00 2853.00 17
2004-06-13 Perforation 2866.00 2868.00 17
2004-09-16 Cement Plug 2928.00 2936.00 0
2004-10-30 Fracture 2851.00 2868.00 0
2005-09-24 Perforation 2880.00 2884.00 17
2005-09-27 Fracture 2851.00 2884.00 0
2005-10-03 Perforation 2649.00 2654.00 17
2005-10-07 Fracture 2649.00 2654.00 0
1985-11-15 Perforation 2971.70 2973.20 0
1985-11-18 Acid Treatment 2971.70 2973.20 0
1985-11-30 Perforation 2955.50 2958.50 13
1985-11-30 Perforation 2960.00 2961.50 13
1985-12-02 Acid Treatment 2955.50 2961.50 0
1985-12-13 Perforation 2635.50 2636.50 13
1985-12-14 Fracture 2635.50 2636.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 541 0.0 0.0 0.0
2006 6936 0.0 0.0 0.0
2007 4504 0.0 0.0 0.0
2008 7841 0.0 0.0 0.0
2009 8280 0.0 0.0 0.0
2010 5968 0.0 0.0 0.0
2011 8615 0.0 0.0 0.0
2012 5856 0.0 0.0 0.0
2013 8533 0.0 0.0 0.0
2014 8712 0.0 0.0 0.0
2015 7223 0.0 0.0 0.0
2016 1943 0.0 0.0 0.0
2017 2373 0.0 0.0 0.0
2018 4640 0.0 0.0 0.0
2019 4644 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-08-08 Lost Circulation 1140.00 1140.00
1985-09-23 Lost Circulation 3000.00 3000.00
1985-08-25 Kick 2637.00 2637.00

For data sources see[6]

References