X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444171606000

Well Details

Well ID: 0444171606000
Loading map...
Location: 00/06-16-044-17W4/0
Location Alias: 00/06-16-44-17 W4M
Location Alias 2: 00/06-16-044-17 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 17
Section: 16
County/Municipality: Camrose County
Well Name: PANTHER ET AL HOLMBERG 6-16-44-17
Operator Name: Canadian Natural Resources Limited
License Number: 0067144
License Date: 1977-11-30
License Status: Re-Entered
Spud Date: 1977-12-02
Final Drill Date: 1977-12-08
Well Total Depth: 1127.80 m
Surface Hole Latitude: 52.789373
Surface Hole Longitude: -112.415483

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-30 Obtained License
1977-12-08 Finished Drilling
1977-12-08 Well Mode changed to Drilled and Cased
1977-12-09 Drill Stem Test Performed
1977-12-10 Drill Stem Test Performed
1977-12-11 Production Casing Operation Performed
1978-01-03 Perforation Treatment Performed - Jet Perforation
1978-01-06 Perforation Treatment Performed - Cement Squeeze
1978-01-07 Perforation Treatment Performed - Jet Perforation
1978-01-20 Perforation Treatment Performed - Jet Perforation
1978-03-02 Well Began Production
1978-03-02 Well Fluid changed to Gas
1978-03-02 Well Mode changed to Flowing
1992-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-18 Plug Back Performed
1992-11-18 Well Fluid changed to Gas
1992-11-18 Well Log Performed
1992-11-18 Well Mode changed to Abandoned Zone
1992-11-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-03 Perforation 1057.00 1057.70 0
1978-01-06 Cement Squeeze 1057.00 1057.70 0
1978-01-07 Perforation 1040.00 1041.80 0
1978-01-07 Perforation 1043.00 1043.60 0
1978-01-07 Perforation 1044.50 1045.20 0
1978-01-07 Perforation 1046.40 1047.90 0
1978-01-20 Perforation 1027.20 1027.80 0
1978-01-20 Perforation 1029.00 1030.20 0
1992-11-18 Packing Device Capped w/Cement 1013.00 1021.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 3798 0.0 0.0 0.0
1979 7203 0.0 0.0 0.0
1980 7097 0.0 0.0 0.0
1981 3948 0.0 0.0 0.0
1982 3476 0.0 0.0 0.0
1983 4529 0.0 0.0 0.0
1984 4330 0.0 0.0 0.0
1985 4537 0.0 0.0 0.0
1986 1929 0.0 0.0 0.0
1987 7440 0.0 0.0 0.0
1988 8283 0.0 0.0 0.0
1989 5169 0.0 0.0 0.0
1990 1320 0.0 0.0 0.0
1991 260 0.0 0.0 0.0
1992 459 0.0 0.0 0.0

For data sources see[5]

References