X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444173203000

Well Details

Well ID: 0444173203000
Loading map...
Location: 00/03-32-044-17W4/0
Location Alias: 00/03-32-44-17 W4M
Location Alias 2: 00/03-32-044-17 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 17
Section: 32
County/Municipality: Camrose County
Well Name: SCEPTRE ALMX HOLMBERG 3-32-44-17
Operator Name: Canadian Natural Resources Limited
License Number: 0005182
License Date: 1952-08-22
License Status: Abandoned
Spud Date: 1952-09-16
Final Drill Date: 1952-10-19
Well Total Depth: 1469.10 m
Surface Hole Latitude: 52.830624
Surface Hole Longitude: -112.438000

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-08-22 Obtained License
1952-09-26 Drill Stem Test Performed
1952-09-27 Drill Stem Test Performed
1952-10-02 Drill Stem Test Performed
1952-10-03 Drill Stem Test Performed
1952-10-08 Drill Stem Test Performed
1952-10-18 Drill Stem Test Performed
1952-10-19 Finished Drilling
1952-10-25 Production Casing Operation Performed
1952-11-01 Well Mode changed to Drilled and Cased
1952-11-07 Perforation Treatment Performed - Cement Squeeze
1952-11-07 Perforation Treatment Performed - Jet Perforation
1952-11-08 Perforation Treatment Performed - Jet Perforation
1952-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-11-10 Perforation Treatment Performed - Cement Plug
1952-11-11 Perforation Treatment Performed - Jet Perforation
1974-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-03 Well Began Production
1975-06-03 Well Fluid changed to Gas
1975-06-03 Well Mode changed to Flowing
1982-09-25 Perforation Treatment Performed - Jet Perforation
1983-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-09 Perforation Treatment Performed - Jet Perforation
1983-03-09 Well Fluid changed to Gas
1983-03-09 Well Mode changed to Abandoned Zone
1988-03-15 Perforation Treatment Performed - Jet Perforation
1989-08-11 Well Log Performed
1989-08-12 Perforation Treatment Performed - Cement Squeeze
1989-08-12 Plug Back Performed
1989-08-16 Well Log Performed
1989-08-18 Perforation Treatment Performed - Jet Perforation
1989-08-18 Well Log Performed
1989-11-03 Well Fluid changed to Gas
1989-11-03 Well Mode changed to Flowing
2000-03-01 Well Fluid changed to Gas
2000-03-01 Well Mode changed to Suspended
2001-10-03 Well Fluid changed to Gas
2001-10-03 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Suspended
2006-12-04 Well Log Performed
2006-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-05 Plug Back Performed
2006-12-05 Well Fluid changed to Gas
2006-12-05 Well Log Performed
2006-12-05 Well Mode changed to Abandoned Zone
2006-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-06 Perforation Treatment Performed - Jet Perforation
2006-12-06 Perforation Treatment Performed - Remedial Casing
2006-12-06 Well Log Performed
2006-12-11 Well Abandoned
2006-12-11 Well Fluid changed to Gas
2006-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-07 Perforation 1159.50 1160.70 13
1983-03-09 Perforation 1023.10 1026.10 13
1988-03-15 Perforation 1035.10 1037.10 13
1988-03-15 Perforation 1045.50 1047.00 13
1989-08-12 Cement Squeeze 1023.10 1047.00 0
1989-08-18 Perforation 1037.00 1039.00 13
2006-12-05 Packing Device Capped w/Cement 1138.00 1146.00 0
2006-12-05 Packing Device Capped w/Cement 1022.00 1030.00 0
2006-12-06 Perforation 400.00 401.00 13
2006-12-06 Remedial Casing Cementing 400.00 401.00 0
2006-12-06 Packing Device Capped w/Cement 373.00 393.00 0
1952-11-07 Cement Squeeze 1159.50 1160.70 0
1952-11-08 Perforation 1152.80 1155.80 13
1952-11-09 Acid Treatment 1152.80 1155.80 0
1952-11-10 Cement Plug 1061.60 1061.60 0
1952-11-11 Perforation 1045.50 1047.00 13
1974-08-06 Acid Treatment 1045.50 1047.00 0
1982-09-25 Perforation 1035.10 1037.10 13
1983-03-07 Packing Device Capped w/Cement 1030.70 1033.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 31 0.0 0.0 0.0
1975 3578 0.0 0.0 0.0
1976 7870 0.0 0.0 0.0
1977 5654 0.0 0.0 0.0
1978 2676 0.0 0.0 0.0
1979 2137 0.0 0.0 0.0
1980 3669 0.0 0.0 0.0
1981 6163 0.0 0.0 0.0
1982 3797 0.0 0.0 0.0
1983 71 0.0 0.0 0.0
1989 848 0.0 0.0 0.0
1990 1188 0.0 0.0 0.0
1991 1571 0.0 0.0 0.0
1992 3825 0.0 0.0 0.0
1993 6474 0.0 0.0 0.0
1994 1844 0.0 0.0 0.0
2001 804 0.0 0.0 0.0

For data sources see[5]

References