X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444181407002

Well Details

Well ID: 0444181407002
Loading map...
Location: 00/07-14-044-18W4/2
Location Alias: 00/07-14-44-18 W4M
Location Alias 2: 00/07-14-044-18 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 18
Section: 14
County/Municipality: Camrose County
Well Name: EMBER KELSEY 7-14-44-18
Operator Name: Ember Resources Inc.
License Number: 0083490
License Date: 1980-06-13
License Status: Issued
Spud Date: 1980-06-20
Final Drill Date: 1980-06-26
Well Total Depth: 1241.00 m
Surface Hole Latitude: 52.788952
Surface Hole Longitude: -112.502613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-13 Obtained License
1980-06-26 Finished Drilling
1980-06-26 Well Mode changed to Drilled and Cased
1980-06-29 Drill Stem Test Performed
1980-06-30 Drill Stem Test Performed
1980-07-01 Drill Stem Test Performed
1980-07-02 Lost Circulation Occurred
1980-07-02 Production Casing Operation Performed
1980-09-06 Perforation Treatment Performed - Jet Perforation
1980-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-26 Perforation Treatment Performed - Jet Perforation
1980-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-19 Perforation Treatment Performed - Jet Perforation
1981-03-03 Well Began Production
1981-03-03 Well Fluid changed to Gas
1981-03-03 Well Mode changed to Flowing
1986-11-01 Well Fluid changed to Gas
1986-11-01 Well Mode changed to Suspended
1987-11-26 Well Fluid changed to Gas
1987-11-26 Well Mode changed to Flowing
2004-09-01 Well Fluid changed to Gas
2004-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-06 Perforation 1088.20 1091.20 7
1980-10-26 Packing Device Capped w/Cement 1077.00 1085.00 0
1980-10-26 Perforation 1073.40 1075.50 7
1980-10-27 Acid Treatment 1073.40 1075.50 0
1980-11-19 Perforation 415.50 418.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1805 0.0 0.0 0.0
1982 2621 0.0 0.0 0.0
1983 1811 0.0 0.0 0.0
1984 4856 0.0 0.0 0.0
1985 3402 0.0 0.0 0.0
1987 529 0.0 0.0 0.0
1988 5790 0.0 0.0 0.0
1989 6289 0.0 0.0 0.0
1990 8562 0.0 0.0 0.0
1991 8419 0.0 0.0 0.0
1992 8658 0.0 0.0 0.0
1993 8261 0.0 0.0 0.0
1994 8692 0.0 0.0 0.0
1995 8655 0.0 0.0 0.0
1996 8688 0.0 0.0 0.0
1997 5592 0.0 0.0 0.0
1998 6209 0.0 0.0 0.0
1999 8579 0.0 0.0 0.0
2000 8427 0.0 0.0 0.0
2001 8652 0.0 0.0 0.0
2002 8565 0.0 0.0 0.0
2003 8407 0.0 0.0 0.0
2004 7651 0.0 0.0 0.0
2005 8100 0.0 0.0 0.0
2006 7593 0.0 0.0 0.0
2007 8686 0.0 0.0 0.0
2008 8455 0.0 0.0 0.0
2009 8695 0.0 0.0 0.0
2010 8623 0.0 0.0 0.0
2011 8630 0.0 0.0 0.0
2012 8385 0.0 0.0 0.0
2013 4508 0.0 0.0 0.0
2014 8324 0.0 0.0 0.0
2015 8714 0.0 0.0 0.0
2016 8633 0.0 0.0 0.0
2017 8599 0.0 0.0 0.0
2018 8372 0.0 0.0 0.0
2019 8614 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-07-02 Lost Circulation 1241.00 1241.00

For data sources see[6]

References