X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444200703023

Well Details

Well ID: 0444200703023
Loading map...
Location: 02/03-07-044-20W4/3
Location Alias: 02/03-07-44-20 W4M
Location Alias 2: 02/03-07-044-20 W4/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 20
Section: 07
County/Municipality: Camrose County
Well Name: SPL 102 FERIN 3-7-44-20
Operator Name: Spur Petroleum Ltd.
License Number: 0339645
License Date: 2005-10-08
License Status: Abandoned
Spud Date: 2005-10-26
Final Drill Date: 2005-10-29
Well Total Depth: 1315.00 m
Surface Hole Latitude: 52.771584
Surface Hole Longitude: -112.897315

For data sources see[1][2]

Well History

Date Event
2005-10-08 Obtained License
2005-10-27 Surface Casing Operation Performed
2005-10-29 Finished Drilling
2005-10-29 Well Mode changed to Drilled and Cased
2005-10-30 Well Log Performed
2005-10-31 Production Casing Operation Performed
2005-10-31 Rig Released
2005-11-05 Well Log Performed
2005-11-06 Perforation Treatment Performed - Jet Perforation
2005-11-06 Well Log Performed
2009-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-10-22 Plug Back Performed
2009-10-22 Well Log Performed
2009-10-25 Perforation Treatment Performed - Fractured
2010-01-06 Well Began Production
2010-01-06 Well Fluid changed to Coalbed Methane-Coals Only
2010-01-06 Well Mode changed to Flowing
2010-02-28 Well Fluid changed to Coalbed Methane-Coals Only
2010-02-28 Well Mode changed to Suspended
2018-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-30 Plug Back Performed
2018-09-30 Well Fluid changed to Coalbed Methane-Coals Only
2018-09-30 Well Mode changed to Abandoned Zone
2018-11-02 Well Abandoned
2018-11-02 Well Fluid changed to Coalbed Methane-Coals Only
2018-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-06 Perforation 570.50 571.50 20
2009-10-22 Perforation 225.00 227.00 14
2009-10-22 Perforation 252.90 253.90 14
2009-10-25 Fracture 225.00 284.40 0
2018-09-30 Packing Device Capped w/Cement 207.00 215.00 0
2005-11-06 Perforation 458.00 460.00 20
2005-11-06 Perforation 327.00 329.50 20
2009-10-22 Packing Device Capped w/Cement 559.00 567.00 0
2009-10-22 Packing Device Capped w/Cement 447.00 455.00 0
2009-10-22 Packing Device Capped w/Cement 317.00 325.00 0
2009-10-22 Perforation 282.40 284.40 14
2009-10-22 Perforation 265.50 266.50 14
2009-10-22 Perforation 236.80 237.80 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1032 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References