X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444202414002

Well Details

Well ID: 0444202414002
Loading map...
Location: 00/14-24-044-20W4/2
Location Alias: 00/14-24-44-20 W4M
Location Alias 2: 00/14-24-044-20 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 20
Section: 24
County/Municipality: Camrose County
Well Name: RIFE EDBERG 14-24-44-20
Operator Name: Rife Resources Ltd.
License Number: 0140873
License Date: 1989-09-11
License Status: RecCertified
Spud Date: 1989-09-11
Final Drill Date: 1989-09-16
Well Total Depth: 1320.00 m
Surface Hole Latitude: 52.810362
Surface Hole Longitude: -112.775014

For data sources see[1][2]

Well History

Date Event
1989-09-11 Obtained License
1989-09-12 Surface Casing Operation Performed
1989-09-16 Finished Drilling
1989-09-16 Well Log Performed
1989-09-16 Well Mode changed to Drilled and Cased
1989-09-17 Drill Stem Test Performed
1989-09-17 Well Log Performed
1989-09-18 Production Casing Operation Performed
1989-09-18 Rig Released
1993-07-24 Well Log Performed
1993-07-25 Perforation Treatment Performed - Jet Perforation
1993-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-30 Well Log Performed
1993-07-31 Perforation Treatment Performed - Jet Perforation
1994-05-09 Well Log Performed
1994-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-10 Plug Back Performed
1994-05-10 Well Began Production
1994-05-10 Well Fluid changed to Gas
1994-05-10 Well Log Performed
1994-05-10 Well Mode changed to Flowing
1994-05-11 Perforation Treatment Performed - Jet Perforation
1996-04-01 Well Fluid changed to Gas
1996-04-01 Well Mode changed to Suspended
1999-01-21 Well Log Performed
1999-01-22 Perforation Treatment Performed - Cement Squeeze
1999-01-22 Plug Back Performed
1999-02-10 Well Abandoned
1999-02-10 Well Fluid changed to Gas
1999-02-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-25 Perforation 1206.50 1207.00 14
1993-07-26 Acid Treatment 1206.50 1207.00 0
1993-07-31 Perforation 1211.00 1212.00 14
1994-05-10 Packing Device Capped w/Cement 1195.00 1203.00 0
1994-05-11 Perforation 1185.50 1188.50 12
1999-01-22 Cement Squeeze 1185.50 1186.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1535 0.0 0.0 0.0

For data sources see[5]

References