X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444210216000

Well Details

Well ID: 0444210216000
Loading map...
Location: 00/16-02-044-21W4/0
Location Alias: 00/16-02-44-21 W4M
Location Alias 2: 00/16-02-044-21 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 21
Section: 02
County/Municipality: Camrose County
Well Name: BAYTEX FERINTOSH 16-2-44-21
Operator Name: Baytex Energy Ltd.
License Number: 0180301
License Date: 1995-08-28
License Status: Suspension
Spud Date: 1995-09-17
Final Drill Date: 1995-09-21
Well Total Depth: 1415.00 m
Surface Hole Latitude: 52.769869
Surface Hole Longitude: -112.931899

For data sources see[1][2]

Well History

Date Event
1995-08-28 Obtained License
1995-09-18 Surface Casing Operation Performed
1995-09-21 Finished Drilling
1995-09-21 Well Mode changed to Drilled and Cased
1995-09-22 Drill Stem Test Performed
1995-09-22 Well Log Performed
1995-09-23 Production Casing Operation Performed
1995-09-23 Rig Released
1995-10-03 Well Log Performed
1995-10-04 Well Log Performed
1995-10-05 Perforation Treatment Performed - Jet Perforation
1996-01-08 Well Began Production
1996-01-08 Well Fluid changed to Gas
1996-01-08 Well Mode changed to Flowing
1996-07-23 Well Log Performed
1996-07-24 Perforation Treatment Performed - Cement Squeeze
1996-07-24 Perforation Treatment Performed - Jet Perforation
1996-07-27 Well Log Performed
1996-07-29 Perforation Treatment Performed - Jet Perforation
1997-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-13 Perforation Treatment Performed - Jet Perforation
1997-09-13 Plug Back Performed
1997-09-13 Well Log Performed
1997-09-14 Perforation Treatment Performed - Jet Perforation
1997-09-14 Well Log Performed
1997-09-17 Perforation Treatment Performed - Fractured
2000-05-01 Well Fluid changed to Gas
2000-05-01 Well Mode changed to Suspended
2008-03-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-05 Perforation 1293.50 1295.00 13
1996-07-24 Perforation 1298.00 1299.00 13
1996-07-24 Cement Squeeze 1293.50 1299.00 0
1996-07-29 Perforation 1293.50 1296.00 13
1997-09-13 Packing Device Capped w/Cement 1277.00 1285.00 0
1997-09-13 Perforation 559.00 561.00 20
1997-09-14 Perforation 511.00 512.50 20
1997-09-14 Perforation 420.00 425.50 20
1997-09-17 Fracture 420.00 561.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 8072 0.0 0.0 0.0
1997 5956 0.0 0.0 0.0

For data sources see[5]

References