X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221014020

Well Details

Well ID: 0444221014020
Loading map...
Location: 02/14-10-044-22W4/0
Location Alias: 02/14-10-44-22 W4M
Location Alias 2: 02/14-10-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ETAL 102 MALMO 14-10-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0059939
License Date: 1976-08-27
License Status: Abandoned
Spud Date: 1976-09-17
Final Drill Date: 1976-09-30
Well Total Depth: 1604.50 m
Surface Hole Latitude: 52.782919
Surface Hole Longitude: -113.113834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-27 Obtained License
1976-09-28 Drill Stem Test Performed
1976-09-30 Finished Drilling
1976-09-30 Well Mode changed to Drilled and Cased
1976-10-01 Drill Stem Test Performed
1976-10-02 Drill Stem Test Performed
1976-10-02 Production Casing Operation Performed
1976-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-14 Perforation Treatment Performed - Jet Perforation
1976-11-17 Perforation Treatment Performed - Jet Perforation
1976-11-18 Perforation Treatment Performed - Cement Squeeze
1976-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-20 Perforation Treatment Performed - Jet Perforation
1976-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-01 Well Began Production
1977-03-01 Well Fluid changed to Crude Oil
1977-03-01 Well Mode changed to Pumping
1989-01-31 Well Fluid changed to Crude Oil
1989-01-31 Well Mode changed to Suspended
1994-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-18 Plug Back Performed
1994-03-18 Well Fluid changed to Crude Oil
1994-03-18 Well Log Performed
1994-03-18 Well Mode changed to Abandoned Zone
1994-03-21 Perforation Treatment Performed - Jet Perforation
1994-03-21 Well Log Performed
1994-03-24 Perforation Treatment Performed - Jet Perforation
1994-03-24 Well Log Performed
1994-03-31 Perforation Treatment Performed - Cement Squeeze
1995-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-08 Plug Back Performed
1995-05-08 Well Log Performed
1995-05-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-14 Perforation 1520.30 1525.80 13
1994-03-24 Perforation 1334.40 1335.30 13
1994-03-31 Cement Squeeze 1334.40 1335.30 0
1995-05-08 Packing Device Capped w/Cement 1364.00 1372.00 0
1976-11-14 Acid Treatment 1520.30 1525.80 0
1976-11-17 Perforation 1533.10 1534.40 13
1976-11-18 Cement Squeeze 1520.30 1534.40 0
1976-11-20 Perforation 1520.30 1523.40 7
1976-11-20 Acid Treatment 1520.30 1523.40 0
1976-11-23 Acid Treatment 1520.30 1523.40 0
1994-03-18 Packing Device Capped w/Cement 1506.00 1514.00 0
1994-03-21 Perforation 1378.90 1381.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 7076 0.0 0.0 0.0
1978 8305 0.0 0.0 0.0
1979 8199 0.0 0.0 0.0
1980 8625 0.0 0.0 0.0
1981 8489 0.0 0.0 0.0
1982 8361 0.0 0.0 0.0
1983 8703 0.0 0.0 0.0
1984 8186 0.0 0.0 0.0
1985 3965 0.0 0.0 0.0
1986 7469 0.0 0.0 0.0
1987 8527 0.0 0.0 0.0
1988 4550 0.0 0.0 0.0

For data sources see[5]

References