X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221411002

Well Details

Well ID: 0444221411002
Loading map...
Location: 00/11-14-044-22W4/2
Location Alias: 00/11-14-44-22 W4M
Location Alias 2: 00/11-14-044-22 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 5-14-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004791
License Date: 1952-06-06
License Status: RecCertified
Spud Date: 1952-06-06
Final Drill Date: 1952-07-01
Well Total Depth: 1620.00 m
Surface Hole Latitude: 52.794255
Surface Hole Longitude: -113.091394

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-06 Obtained License
1952-07-01 Drill Stem Test Performed
1952-07-01 Finished Drilling
1952-07-01 Well Mode changed to Drilled and Cased
1952-07-02 Liner Casing Operation Performed
1952-07-04 Drill Stem Test Performed
1952-07-04 Perforation Treatment Performed - Bullet Perforation
1964-04-01 Perforation Treatment Performed - Cement Squeeze
1964-04-03 Perforation Treatment Performed - Jet Perforation
1965-06-21 Perforation Treatment Performed - Bullet Perforation
1965-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-22 Well Log Performed
1990-06-23 Well Log Performed
1990-06-24 Perforation Treatment Performed - Jet Perforation
1990-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-25 Plug Back Performed
1990-06-25 Well Log Performed
1990-06-26 Perforation Treatment Performed - Jet Perforation
1990-06-26 Well Log Performed
1990-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-29 Perforation Treatment Performed - Jet Perforation
1990-06-29 Well Log Performed
1990-07-28 Well Began Production
1990-07-28 Well Fluid changed to Crude Oil
1990-07-28 Well Mode changed to Pumping
1991-07-31 Well Fluid changed to Crude Oil
1991-07-31 Well Mode changed to Suspended
1992-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-12 Perforation Treatment Performed - Jet Perforation
1992-07-12 Well Log Performed
1992-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-13 Perforation Treatment Performed - Cement Squeeze
1992-07-13 Plug Back Performed
1992-07-31 Well Fluid changed to Crude Oil
1992-07-31 Well Mode changed to Abandoned and Whipstocked
2003-11-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-04 Bullet Perforation 1611.20 1614.20 13
1990-06-25 Packing Device Capped w/Cement 1524.00 1526.00 0
1990-06-26 Perforation 1519.70 1521.30 13
1990-06-27 Acid Treatment 1519.70 1521.30 0
1990-06-29 Packing Device Capped w/Cement 1515.00 1518.00 0
1990-06-29 Perforation 1508.00 1511.00 13
1992-07-12 Packing Device Capped w/Cement 1495.00 1498.00 0
1992-07-12 Perforation 1180.20 1180.50 13
1992-07-13 Acid Treatment 1180.20 1180.50 0
1992-07-13 Cement Squeeze 1180.20 1180.50 0
1964-04-01 Cement Squeeze 1611.20 1614.20 0
1964-04-03 Perforation 1604.50 1606.00 7
1965-06-21 Bullet Perforation 1592.90 1604.50 7
1965-06-21 Bullet Perforation 1606.00 1606.90 7
1965-06-22 Acid Treatment 1592.90 1606.90 0
1990-06-24 Perforation 1527.00 1528.60 13
1990-06-25 Acid Treatment 1527.00 1528.60 0
1990-06-25 Packing Device Capped w/Cement 1550.50 1558.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3630 0.0 0.0 0.0
1991 2731 0.0 0.0 0.0

For data sources see[5]

References