X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221414004

Well Details

Well ID: 0444221414004
Loading map...
Location: 00/14-14-044-22W4/4
Location Alias: 00/14-14-44-22 W4M
Location Alias 2: 00/14-14-044-22 W4/04
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 14-14L-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0005025
License Date: 1952-07-19
License Status: RecCertified
Spud Date: 1952-08-13
Final Drill Date: 1952-09-02
Well Total Depth: 1619.10 m
Surface Hole Latitude: 52.797256
Surface Hole Longitude: -113.090968

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-19 Obtained License
1952-08-26 Drill Stem Test Performed
1952-09-02 Drill Stem Test Performed
1952-09-02 Finished Drilling
1952-09-02 Well Mode changed to Drilled and Cased
1952-09-03 Production Casing Operation Performed
1952-09-06 Perforation Treatment Performed - Bullet Perforation
1964-06-20 Perforation Treatment Performed - Cement Squeeze
1964-06-21 Perforation Treatment Performed - Bullet Perforation
1964-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-24 Well Log Performed
1978-05-26 Perforation Treatment Performed - Cement Squeeze
1978-05-29 Perforation Treatment Performed - Jet Perforation
1978-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-01 Perforation Treatment Performed - Jet Perforation
1985-11-02 Perforation Treatment Performed - Acid Wash - No Pressure
1989-11-18 Well Log Performed
1990-02-17 Well Log Performed
1990-02-19 Well Log Performed
1990-02-20 Perforation Treatment Performed - Jet Perforation
1990-02-20 Well Log Performed
1990-02-22 Well Log Performed
1992-02-06 Perforation Treatment Performed - Jet Perforation
1992-02-07 Perforation Treatment Performed - Jet Perforation
1992-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-09 Perforation Treatment Performed - Jet Perforation
1992-03-09 Perforation Treatment Performed - Jet Perforation
1992-03-09 Well Log Performed
1992-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-05 Well Log Performed
1993-02-07 Well Log Performed
1994-06-26 Well Log Performed
1994-06-27 Perforation Treatment Performed - Cement Squeeze
1994-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-01 Plug Back Performed
1994-07-01 Well Log Performed
1994-07-02 Perforation Treatment Performed - Jet Perforation
1994-07-02 Well Log Performed
1994-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-04 Plug Back Performed
1994-07-04 Well Log Performed
1994-07-05 Perforation Treatment Performed - Jet Perforation
1994-07-05 Well Log Performed
1994-07-06 Perforation Treatment Performed - Jet Perforation
1994-07-06 Well Log Performed
1996-03-31 Well Log Performed
1996-04-01 Well Log Performed
1996-04-02 Perforation Treatment Performed - Jet Perforation
2001-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-04 Plug Back Performed
2001-05-04 Well Log Performed
2001-05-05 Perforation Treatment Performed - Jet Perforation
2001-05-05 Well Log Performed
2001-05-08 Perforation Treatment Performed - Fractured
2001-05-13 Well Began Production
2001-05-13 Well Fluid changed to Gas
2001-05-13 Well Mode changed to Flowing
2003-02-28 Well Fluid changed to Gas
2003-02-28 Well Mode changed to Suspended
2003-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-06 Plug Back Performed
2003-11-06 Well Fluid changed to Gas
2003-11-06 Well Mode changed to Abandoned Zone
2003-11-14 Well Abandoned
2003-11-14 Well Fluid changed to Gas
2003-11-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-06 Bullet Perforation 1614.50 1617.60 0
1990-02-20 Perforation 1595.60 1597.10 13
1992-02-06 Perforation 1434.70 1435.90 13
1992-02-07 Perforation 1433.20 1434.70 13
1992-02-08 Acid Treatment 1433.20 1435.90 0
1992-02-09 Perforation 1428.50 1430.50 13
1992-03-09 Perforation 1592.30 1593.50 13
1992-03-10 Acid Treatment 1592.30 1593.50 0
1994-06-27 Cement Squeeze 1428.50 1435.90 0
1994-07-01 Packing Device Capped w/Cement 1575.00 1583.00 0
1994-07-02 Perforation 1463.00 1466.00 13
1964-06-20 Cement Squeeze 1614.50 1617.60 0
1994-07-03 Acid Treatment 1463.00 1466.00 0
1994-07-04 Packing Device Capped w/Cement 1447.00 1455.00 0
1994-07-05 Perforation 1364.90 1366.10 13
1994-07-05 Perforation 1367.30 1368.60 13
1994-07-06 Perforation 1168.00 1169.80 13
1996-04-02 Perforation 1356.00 1358.00 17
1996-04-02 Perforation 1360.50 1362.00 17
2001-05-04 Packing Device Capped w/Cement 1346.00 1354.00 0
2001-05-05 Perforation 1335.60 1338.50 17
2001-05-08 Fracture 1335.60 1338.50 0
1964-06-21 Bullet Perforation 1607.50 1609.00 7
2003-11-06 Packing Device Capped w/Cement 1155.00 1163.00 0
2003-11-06 Packing Device Capped w/Cement 1322.00 1330.00 0
1964-06-25 Acid Treatment 1607.50 1609.00 0
1978-05-26 Cement Squeeze 1607.50 1609.00 0
1978-05-29 Perforation 1603.20 1603.60 13
1978-05-30 Acid Treatment 1603.20 1603.60 0
1985-11-01 Perforation 1587.10 1588.30 13
1985-11-02 Acid Wash 1587.10 1588.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 3663 0.0 0.0 0.0

For data sources see[5]

References