X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444231501003

Well Details

Well ID: 0444231501003
Loading map...
Location: 00/01-15-044-23W4/3
Location Alias: 00/01-15-44-23 W4M
Location Alias 2: 00/01-15-044-23 W4/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 23
Section: 15
County/Municipality: County of Wetaskiwin No. 10
Well Name: EMBER DYBERG 1-15-44-23
Operator Name: Ember Resources Inc.
License Number: 0238779
License Date: 2000-06-20
License Status: Abandoned
Spud Date: 2000-07-20
Final Drill Date: 2000-08-04
Well Total Depth: 1545.00 m
Surface Hole Latitude: 52.789325
Surface Hole Longitude: -113.251714

For data sources see[1][2]

Well History

Date Event
2000-06-20 Obtained License
2000-07-21 Surface Casing Operation Performed
2000-07-26 Direction Drilling Operation Performed - Deviate
2000-08-04 Finished Drilling
2000-08-04 Well Log Performed
2000-08-04 Well Mode changed to Drilled and Cased
2000-08-05 Production Casing Operation Performed
2000-08-05 Rig Released
2000-08-20 Perforation Treatment Performed - Jet Perforation
2000-08-21 Well Log Performed
2001-01-28 Perforation Treatment Performed - Jet Perforation
2001-01-28 Well Log Performed
2001-01-29 Perforation Treatment Performed - Remedial Casing
2001-01-31 Perforation Treatment Performed - Jet Perforation
2001-01-31 Well Log Performed
2001-02-05 Perforation Treatment Performed - Jet Perforation
2001-02-05 Well Log Performed
2001-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-23 Perforation Treatment Performed - Jet Perforation
2001-03-23 Plug Back Performed
2001-03-23 Well Log Performed
2001-03-25 Well Began Production
2001-03-25 Well Fluid changed to Gas
2001-03-25 Well Mode changed to Flowing
2009-06-01 Well Fluid changed to Gas
2009-06-01 Well Mode changed to Suspended
2010-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-07 Perforation Treatment Performed - Cement Plug
2010-12-07 Perforation Treatment Performed - Jet Perforation
2010-12-07 Perforation Treatment Performed - Remedial Casing
2010-12-07 Plug Back Performed
2010-12-07 Well Fluid changed to Gas
2010-12-07 Well Mode changed to Abandoned Zone
2012-05-10 Perforation Treatment Performed - Jet Perforation
2012-05-12 Perforation Treatment Performed - Cement Squeeze
2012-05-12 Plug Back Performed
2012-05-18 Perforation Treatment Performed - Jet Perforation
2012-05-25 Perforation Treatment Performed - Cement Plug
2012-05-25 Perforation Treatment Performed - Cement Squeeze
2012-05-25 Plug Back Performed
2012-05-26 Perforation Treatment Performed - Jet Perforation
2012-05-27 Perforation Treatment Performed - Cement Squeeze
2012-05-28 Perforation Treatment Performed - Jet Perforation
2012-05-30 Perforation Treatment Performed - Cement Squeeze
2012-05-31 Perforation Treatment Performed - Jet Perforation
2012-06-02 Perforation Treatment Performed - Cement Squeeze
2012-06-03 Perforation Treatment Performed - Cement Plug
2012-06-03 Plug Back Performed
2012-06-14 Well Abandoned
2012-06-14 Well Fluid changed to Gas
2012-06-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-07-26 199.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-20 Perforation 1524.00 1525.20 14
2010-12-07 Perforation 500.00 501.00 20
2010-12-07 Remedial Casing Cementing 500.00 501.00 0
2010-12-07 Cement Plug 495.00 683.80 0
2012-05-10 Perforation 697.20 698.20 14
2012-05-10 Perforation 700.00 701.00 14
2012-05-12 Cement Squeeze 697.20 698.20 0
2012-05-12 Cement Squeeze 700.00 701.00 0
2012-05-18 Perforation 1524.00 1525.00 14
2012-05-18 Perforation 1525.20 1526.00 14
2012-05-25 Cement Squeeze 1524.00 1525.20 0
2001-01-28 Perforation 1527.00 1527.30 20
2012-05-25 Cement Plug 1150.00 1430.00 0
2012-05-25 Cement Squeeze 1525.20 1526.00 0
2012-05-26 Perforation 471.00 473.00 20
2012-05-26 Perforation 500.00 502.00 20
2012-05-27 Cement Squeeze 471.00 473.00 0
2012-05-27 Cement Squeeze 500.00 502.00 0
2012-05-28 Perforation 380.00 382.00 20
2012-05-28 Perforation 416.00 418.00 20
2012-05-30 Cement Squeeze 380.00 382.00 0
2012-05-30 Cement Squeeze 416.00 418.00 0
2001-01-29 Remedial Casing Cementing 1527.00 1527.30 0
2012-05-31 Perforation 338.00 340.00 20
2012-05-31 Perforation 258.00 260.00 20
2012-06-02 Cement Squeeze 338.00 340.00 0
2012-06-02 Cement Squeeze 258.00 260.00 0
2012-06-03 Cement Plug 247.00 255.00 0
2001-01-31 Perforation 1524.00 1525.20 14
2001-02-05 Perforation 1525.20 1526.00 14
2001-03-23 Packing Device Capped w/Cement 1512.00 1520.00 0
2001-03-23 Perforation 697.20 698.20 14
2001-03-23 Perforation 700.00 701.00 14
2010-12-07 Packing Device Capped w/Cement 683.80 692.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5088 0.0 0.0 0.0
2002 8627 0.0 0.0 0.0
2003 7346 0.0 0.0 0.0
2004 5718 0.0 0.0 0.0
2005 7862 0.0 0.0 0.0
2006 6285 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-10 No Incident Encountered 0.00 0.00
2012-05-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References