X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445063412002

Well Details

Well ID: 0445063412002
Loading map...
Location: 00/12-34-044-06W5/2
Location Alias: 00/12-34-44-06 W5M
Location Alias 2: 00/12-34-044-06 W5/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 06
Section: 34
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC 1-2 HZ PEMBINA 12-34-44-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0493075
License Date: 2019-01-07
License Status: Amended
Spud Date: 2019-06-24
Final Drill Date: 2019-07-06
Well Total Depth: 4784.00 m
Surface Hole Latitude: 52.845960
Surface Hole Longitude: -114.756258

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-06-26 696.70 Deviate (5 - 79 degrees)
2019-06-28 1840.10 Horizontal
2019-07-03 3281.00 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-31 Multi-Stage Fracture 4729.50 4729.60 0
2019-07-31 Multi-Stage Fracture 4317.80 4317.90 0
2019-07-31 Multi-Stage Fracture 4271.50 4271.60 0
2019-07-31 Multi-Stage Fracture 4224.40 4224.50 0
2019-07-31 Multi-Stage Fracture 4176.80 4176.90 0
2019-07-31 Multi-Stage Fracture 4129.30 4129.40 0
2019-07-31 Multi-Stage Fracture 4081.90 4082.00 0
2019-07-31 Multi-Stage Fracture 4034.80 4034.90 0
2019-07-31 Multi-Stage Fracture 3987.50 3987.60 0
2019-07-31 Multi-Stage Fracture 3940.30 3940.40 0
2019-07-31 Multi-Stage Fracture 3893.40 3893.50 0
2019-07-31 Multi-Stage Fracture 4681.60 4681.70 0
2019-07-31 Multi-Stage Fracture 3845.60 3845.70 0
2019-07-31 Multi-Stage Fracture 3797.70 3797.80 0
2019-07-31 Multi-Stage Fracture 3749.90 3750.00 0
2019-07-31 Multi-Stage Fracture 3702.30 3702.40 0
2019-07-31 Multi-Stage Fracture 3654.80 3654.90 0
2019-07-31 Multi-Stage Fracture 3607.00 3607.10 0
2019-07-31 Multi-Stage Fracture 3559.10 3559.20 0
2019-08-01 Multi-Stage Fracture 3511.30 3511.40 0
2019-08-01 Multi-Stage Fracture 3463.30 3463.40 0
2019-08-01 Multi-Stage Fracture 3415.90 3416.00 0
2019-07-31 Multi-Stage Fracture 4648.00 4648.10 0
2019-08-01 Multi-Stage Fracture 3368.80 3368.90 0
2019-08-01 Multi-Stage Fracture 3324.10 3324.20 0
2019-08-01 Multi-Stage Fracture 3276.40 3276.50 0
2019-08-01 Multi-Stage Fracture 3230.50 3230.60 0
2019-08-01 Multi-Stage Fracture 3183.90 3184.00 0
2019-08-01 Multi-Stage Fracture 3137.00 3137.10 0
2019-08-01 Multi-Stage Fracture 3092.20 3092.30 0
2019-08-01 Multi-Stage Fracture 3045.60 3045.70 0
2019-08-01 Multi-Stage Fracture 2999.80 2999.90 0
2019-08-01 Multi-Stage Fracture 2953.70 2953.80 0
2019-07-31 Multi-Stage Fracture 4601.20 4601.30 0
2019-08-01 Multi-Stage Fracture 2907.10 2907.20 0
2019-08-01 Multi-Stage Fracture 2860.90 2861.00 0
2019-08-01 Multi-Stage Fracture 2814.30 2814.40 0
2019-08-01 Multi-Stage Fracture 2767.70 2767.80 0
2019-08-01 Multi-Stage Fracture 2722.10 2722.20 0
2019-08-01 Multi-Stage Fracture 2678.00 2678.10 0
2019-08-01 Multi-Stage Fracture 2632.50 2632.60 0
2019-08-01 Multi-Stage Fracture 2586.40 2586.50 0
2019-08-01 Multi-Stage Fracture 2539.60 2539.70 0
2019-08-01 Multi-Stage Fracture 2492.20 2492.30 0
2019-07-31 Multi-Stage Fracture 4553.40 4553.50 0
2019-08-01 Multi-Stage Fracture 2445.60 2445.70 0
2019-08-01 Multi-Stage Fracture 2398.40 2398.50 0
2019-07-31 Multi-Stage Fracture 4505.90 4506.00 0
2019-07-31 Multi-Stage Fracture 4458.60 4458.70 0
2019-07-31 Multi-Stage Fracture 4412.10 4412.20 0
2019-07-31 Multi-Stage Fracture 4365.10 4365.20 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-31 2019-08-01 1,730 5,430 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.5208 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.2783 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.3304 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0097 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0097 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0732 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0732 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0439 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0439 N/A
ELEFE-4 IFTR Element Surfactant Alkylbenzenesulfonic acid Trade Secret 100 0.0914 N/A
Ethylene Glycol 107-21-1 100 0.0914 N/A
Isopropanol 67-63-0 100 0.0914 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0914 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-07-29 2019-08-03 Surface Water - Runoff 5230

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3302 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-08 No Incident Encountered 0.00 0.00
2019-08-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References