X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445113113002

Well Details

Well ID: 0445113113002
Loading map...
Location: 00/13-31-044-11W5/2
Location Alias: 00/13-31-44-11 W5M
Location Alias 2: 00/13-31-044-11 W5/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 11
Section: 31
County/Municipality: Yellowhead County
Well Name: WESTBRICK BRAZR 13-31-44-11
Operator Name: Westbrick Energy Ltd.
License Number: 0231641
License Date: 2000-01-04
License Status: Suspension
Spud Date: 2000-01-10
Final Drill Date: 2000-02-01
Well Total Depth: 3210.00 m
Surface Hole Latitude: 52.844305
Surface Hole Longitude: -115.598938

For data sources see[1][2]

Well History

Date Event
2000-01-04 Obtained License
2000-01-12 Direction Drilling Operation Performed - Deviate
2000-01-21 Well Log Performed
2000-02-01 Finished Drilling
2000-02-01 Well Log Performed
2000-02-04 Liner Casing Operation Performed
2000-02-07 Rig Released
2000-02-07 Well Mode changed to Drilled and Cased
2000-02-18 Well Log Performed
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-05 Well Fluid changed to Gas
2000-03-05 Well Mode changed to Testing
2000-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-06 Plug Back Performed
2000-03-06 Well Fluid changed to Gas
2000-03-06 Well Mode changed to Abandoned Zone
2001-03-16 Perforation Treatment Performed - Jet Perforation
2001-03-19 Perforation Treatment Performed - Fractured
2001-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-22 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-03-22 Plug Back Performed
2001-03-23 Perforation Treatment Performed - Jet Perforation
2001-03-24 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-12 2737.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-22 Perforation 3088.00 3090.50 20
2001-03-23 Perforation 2178.00 2183.00 14
2001-03-24 Fracture 2178.00 2183.00 0
2000-02-22 Perforation 3098.50 3100.50 20
2000-02-22 Perforation 3102.50 3107.00 20
2000-02-29 Acid Treatment 3088.00 3107.00 0
2000-03-06 Packing Device Capped w/Cement 2920.30 3051.70 0
2001-03-16 Perforation 2777.00 2782.00 13
2001-03-19 Fracture 2777.00 2782.00 0
2001-03-22 Packing Device Capped w/Cement 2760.00 2768.00 0
2001-03-22 Bridge Plug, No Cement 2531.00 2532.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 101 0.0 0.0 0.0

For data sources see[6]

References