X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454081410000

Well Details

Well ID: 0454081410000
Loading map...
Location: 00/10-14-045-08W4/0
Location Alias: 00/10-14-45-08 W4M
Location Alias 2: 00/10-14-045-08 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 08
Section: 14
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TRANS EMPIRE FABYAN 10-14-45-8
Operator Name: Imperial Oil Resources Limited
License Number: 0002985
License Date: 1951-06-05
License Status: RecCertified
Spud Date: 1951-09-01
Final Drill Date: 1951-09-21
Well Total Depth: 742.50 m
Surface Hole Latitude: 52.881671
Surface Hole Longitude: -111.053133

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-05 Obtained License
1951-09-07 Drill Stem Test Performed
1951-09-11 Drill Stem Test Performed
1951-09-18 Production Casing Operation Performed
1951-09-19 Lost Circulation Occurred
1951-09-21 Drill Stem Test Performed
1951-09-21 Finished Drilling
1951-09-21 Well Mode changed to Drilled and Cased
1951-09-29 Perforation Treatment Performed - Jet Perforation
1951-11-27 Well Began Production
1951-11-27 Well Fluid changed to Gas
1951-11-27 Well Mode changed to Flowing
1953-07-14 Well Fluid changed to Gas
1953-07-14 Well Mode changed to Suspended
1975-06-21 Well Fluid changed to Gas
1975-06-21 Well Mode changed to Flowing
1988-06-01 Well Fluid changed to Gas
1988-06-01 Well Mode changed to Suspended
1991-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-13 Plug Back Performed
1991-08-13 Well Fluid changed to Gas
1991-08-13 Well Mode changed to Abandoned
1991-08-14 Perforation Treatment Performed - Jet Perforation
1991-08-14 Well Log Performed
1991-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-16 Perforation Treatment Performed - Jet Perforation
1991-08-16 Perforation Treatment Performed - Remedial Casing
1991-08-16 Well Log Performed
1991-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-29 Perforation 522.10 524.00 13
1991-08-13 Packing Device Capped w/Cement 508.80 516.80 0
1991-08-14 Perforation 239.50 240.00 14
1991-08-16 Packing Device Capped w/Cement 224.50 232.50 0
1991-08-16 Perforation 140.00 140.50 14
1991-08-16 Remedial Casing Cementing 140.00 140.50 0
1991-08-18 Packing Device Capped w/Cement 127.00 135.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1977 3948 0.0 0.0 0.0
1978 6078 0.0 0.0 0.0
1979 5652 0.0 0.0 0.0
1980 5710 0.0 0.0 0.0
1981 6325 0.0 0.0 0.0
1982 5967 0.0 0.0 0.0
1983 6142 0.0 0.0 0.0
1984 5986 0.0 0.0 0.0
1985 5860 0.0 0.0 0.0
1986 5872 0.0 0.0 0.0
1987 5553 0.0 0.0 0.0
1988 3630 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1951-09-19 Lost Circulation 742.50 742.50

For data sources see[6]

References