X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454211713000

Well Details

Well ID: 0454211713000
Loading map...
Location: 00/13-17-045-21W4/0
Location Alias: 00/13-17-45-21 W4M
Location Alias 2: 00/13-17-045-21 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 21
Section: 17
County/Municipality: Camrose County
Well Name: CNRL DUHAMEL 13-17MU-45-21
Operator Name: Canadian Natural Resources Limited
License Number: 0001810
License Date: 1950-07-29
License Status: Abandoned
Spud Date: 1950-08-04
Final Drill Date: 1950-09-09
Well Total Depth: 1486.80 m
Surface Hole Latitude: 52.885240
Surface Hole Longitude: -113.024472

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-29 Obtained License
1950-08-15 Drill Stem Test Performed
1950-08-16 Drill Stem Test Performed
1950-08-18 Drill Stem Test Performed
1950-08-19 Drill Stem Test Performed
1950-08-23 Drill Stem Test Performed
1950-08-25 Drill Stem Test Performed
1950-08-26 Drill Stem Test Performed
1950-08-27 Drill Stem Test Performed
1950-09-04 Drill Stem Test Performed
1950-09-07 Drill Stem Test Performed
1950-09-09 Finished Drilling
1950-09-09 Well Mode changed to Drilled and Cased
1950-09-11 Production Casing Operation Performed
1950-09-13 Drill Stem Test Performed
1950-09-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1950-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1950-09-15 Drill Stem Test Performed
1950-09-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1950-09-15 Perforation Treatment Performed - Jet Perforation
1950-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-09-16 Well Began Production
1950-09-16 Well Fluid changed to Crude Oil
1950-09-16 Well Mode changed to Flowing
1950-09-20 Drill Stem Test Performed
1950-09-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1950-09-23 Perforation Treatment Performed - Jet Perforation
1950-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-09-28 Perforation Treatment Performed - Cement Squeeze
1950-10-02 Drill Stem Test Performed
1950-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-11-27 Perforation Treatment Performed - Jet Perforation
1956-11-30 Perforation Treatment Performed - Acid Wash - No Pressure
1956-12-14 Well Fluid changed to Crude Oil
1956-12-14 Well Mode changed to Pumping
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
1997-05-11 Well Log Performed
1997-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-12 Plug Back Performed
1997-05-12 Well Fluid changed to Crude Oil
1997-05-12 Well Mode changed to Abandoned Zone
1997-05-13 Perforation Treatment Performed - Jet Perforation
1997-05-13 Perforation Treatment Performed - Remedial Casing
1997-05-13 Well Log Performed
2006-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-17 Well Log Performed
2006-06-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-13 Hydra Jet Perforation 1471.00 1471.00 0
1950-10-06 Acid Treatment 1464.90 1469.40 0
1956-11-27 Perforation 1374.00 1377.10 20
1956-11-30 Acid Wash 1374.00 1377.10 0
1997-05-12 Packing Device Capped w/Cement 1358.00 1366.00 0
1997-05-12 Packing Device Capped w/Cement 1444.50 1452.50 0
1997-05-13 Perforation 230.00 231.00 14
1997-05-13 Remedial Casing Cementing 230.00 231.00 0
2006-05-17 Packing Device Capped w/Cement 217.00 225.00 0
1950-09-14 Packing Device Capped w/Cement 1469.40 1469.40 0
1950-09-15 Hydra Jet Perforation 1469.40 1469.40 0
1950-09-15 Perforation 1464.90 1469.40 23
1950-09-16 Acid Treatment 1464.90 1469.40 0
1950-09-20 Hydra Jet Perforation 1378.90 1378.90 0
1950-09-23 Perforation 1372.50 1378.90 26
1950-09-26 Acid Treatment 1372.50 1378.90 0
1950-09-28 Cement Squeeze 1372.50 1378.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1970 720 0.0 0.0 0.0
1987 3146 0.0 0.0 0.0
1988 6454 0.0 0.0 0.0
1989 7033 0.0 0.0 0.0
1990 7464 0.0 0.0 0.0
1991 7363 0.0 0.0 0.0
1992 7943 0.0 0.0 0.0
1993 5629 0.0 0.0 0.0
1994 5096 0.0 0.0 0.0

For data sources see[5]

References